Laserfiche WebLink
Project/Funding Administration <br />$12,500.00 <br />Construction E ineenn <br />$230,000.00 <br />Archaeol ,cal Monitorin <br />r and Billings Avenue Intersection Improvements <br />WSDOT CN Fees <br />7/15/2019 <br />FEngln= <br />70p1n7ion <br />Construction Cost <br />FHWA No. STPR-0903(079) <br />HLA Project Nos. 17089 and 18186 <br />Item <br />No <br />Description <br />Unit <br />Unit Cost <br />Overall <br />Overall Cost <br />Quantity <br />1 <br />Minor Chane <br />FA <br />$25,000.00 <br />1 <br />$25,000.00 <br />2 <br />SPCC Plan <br />LS <br />$2,000.00 <br />1 <br />$2.000.00 <br />3 <br />Archaeological and Historical Salvage <br />FA <br />$100.00 <br />1 <br />$100.00 <br />4 <br />Mobilization <br />LS <br />$150,000.00 <br />1 <br />$150000.00 <br />5 <br />Project Temporary Traffic Control <br />LS <br />$700,000.00 <br />1 <br />$100,000.00 <br />6 <br />Removal of Structures and Obstructions <br />LS <br />$90,000.00 <br />1 <br />$90 000.00 <br />7 <br />Unclassified Excavation Inc. Haul <br />CY <br />$70.00 <br />640 <br />$44,800.00 <br />8 <br />Crushed Surfacing Base Course <br />TON <br />$50.00 <br />1,550 <br />$77,500.00 <br />9 <br />Crushed Surfacino Too Course <br />TON <br />$80.00 <br />210 <br />$16,800.00 <br />HMA Cl. 1/2 -Inch PG 64H-28 <br />TON <br />$140.00 <br />500 <br />$70,000.00 <br />Storm Sewer Pipe 24 In. Diam. <br />LF <br />$80.00 <br />1,780 <br />$142,400.00 <br />Storm Sewer Pi 12 In. Diam, <br />LF <br />$50.00 <br />1,940 <br />$97,OD0.00 <br />K14 <br />Storm Sewer Pipe 6 In. Diam. <br />LF <br />$70.00 <br />40 <br />$2,800.00 <br />Catch Basin T e 2 48 In. Diam, <br />EA <br />$300000 <br />26 <br />$78,000.00 <br />Catch Basin T 1 <br />EA <br />$1,800.00 <br />29 <br />$5Adiust <br />Manhole <br />EA <br />$900.00 <br />1 <br />$900.00 <br />Adjust Mon itoning Well <br />EA <br />$2,000.00 <br />5 <br />$10,000.00 <br />19 <br />Shorin or Extra Excavation <br />LF <br />$5.00 <br />1,760 <br />$8,900.00 <br />20 <br />Select BVI. <br />ackfill as Directed <br />CY <br />$60.00 <br />590 <br />$35,400.00 <br />21 <br />PVC Pipe for Water Main 8 In. Diam. <br />LF <br />$400.00 <br />12 <br />$4,800.00 <br />22 <br />Adjust Valve Box <br />EA <br />$400.00 <br />6 <br />$2,400.00 <br />23 <br />ResettingExisting H rant <br />EA <br />$2,500.00 <br />1 <br />$2,500.00 <br />24 <br />Service Connection 21n. Diam. <br />EA <br />$4,000.00 <br />3 <br />$12,000.00 <br />25 <br />Adjust Meter Box <br />EA <br />$350.00 <br />4 <br />$1 400.00 <br />26 <br />Ini anon S tem, Com tete <br />LS <br />$27,000.00 <br />1 <br />$27,000.00 <br />27 <br />Irrigation Pipe and Sleeve Ca for Future <br />LF <br />$14.00 <br />320 <br />$4,480.00 <br />28 <br />Plant Selection - Red int Maple 2-1/2" Cali r <br />EA <br />$800.00 <br />7 <br />$4 200.00 <br />30 <br />Plant Selection - Kelse i wood 2 Gallon <br />EA <br />$70.00 <br />125 <br />$8,750.00 <br />31 <br />Plant Selection - Black Eyed Susan 1 Gaibn <br />EA <br />$45.00 <br />525 <br />$23,825.OD <br />32 <br />Plant Selection - Woods Compact Kinniklnnick 1 Gallon <br />EA <br />$45.00 <br />570 <br />$25,650.00 <br />33 <br />1025011 TeA <br />CV <br />$70.00 <br />215 <br />$15,050.00 <br />34 <br />Su rade To soil <br />CY <br />$70.00 <br />215 <br />$15 050.00 <br />35 <br />Root Barrier <br />LF <br />$25.00 <br />485 <br />$11,625.00 <br />36 <br />Basalt Rock Mulch <br />CV <br />$160.00 <br />8 <br />$7,280.00 <br />37 <br />Plant Establishment <br />FA <br />$8,000.00 <br />1 <br />$8,000.00 <br />38 <br />Cement Conc. Traffic Curb and Gutter <br />LF <br />$68.00 <br />2,190 <br />$148 920.00 <br />39 <br />Cement Conc. Sidewalk 6 -Inch Thick <br />SY <br />$87.00 <br />65 <br />$5,265.00 <br />40 <br />nt Conc. Sidewalk 4 -Inch Thick <br />BY <br />$73.00 <br />320 <br />$23 360.00 <br />41 <br />nt Conc. Sidewalk 4 -Inch Thick Patterned <br />SY <br />$150.00 <br />1,050 <br />$157,500.00 <br />42 <br />nt Conc. Curb Ram <br />EA <br />$2,000.00 <br />17 <br />$34,000.00 <br />43 <br />LightingSystem, Complete <br />LS <br />$60,000.00 <br />1 <br />$05,000.00 <br />44 <br />kThre"ePhase Service Connection <br />LS <br />$7,300.00 <br />1 <br />$7,300.00 <br />45 <br />Conduit 3 In. Diam. <br />LF <br />$7.00 <br />660 <br />$6,020.0046 <br />Conduit 2 In. Diam. <br />LF <br />$6.OD960 <br />$5,760.00 <br />47 <br />it Installation PSE48 <br />hed Conduit Installation PSE Power <br />LF <br />$3.00 <br />1,280 <br />$3,840.00 <br />49 <br />Furnished Conduit Installation Noel Communications <br />LF <br />$3.00 <br />490 <br />$1,470.00 <br />50 <br />Furnished Conduit Installation Inland Networks <br />LF <br />$3.00 <br />.84 <br />2,840 <br />$6,520.00 <br />51 <br />Furnished Conduit Installation Centu Link <br />LF <br />$3.00 <br />$390.00 <br />52 <br />Permanent Signing <br />LS <br />$7,500.00 <br />1 <br />$7,500.00 <br />53 <br />Pavement Markin s <br />LS <br />$7,000.00 11 <br />1 1 <br />$7,000.00 <br />Total <br />$1,689,175.00 <br />Illumination System PSE <br />$95,000.00 <br />Undergrounding <br />Power PSE <br />$53,325.00 <br />Materials Testing <br />$25,000.00 <br />Total Estimated Construction Cost <br />$1,862,500.00 <br />Project/Funding Administration <br />$12,500.00 <br />Construction E ineenn <br />$230,000.00 <br />Archaeol ,cal Monitorin <br />$15,000.00 <br />WSDOT CN Fees <br />$5,000.00 <br />Total Estimated Project Cost E2,125,000.00 <br />