My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_Big Boulder_Contech
>
Meetings
>
2020
>
04. April
>
2020-04-21 10:00 AM - Commissioners' Agenda
>
Resolution_Big Boulder_Contech
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 12:48:11 PM
Creation date
4/16/2020 12:48:03 PM
Metadata
Fields
Template:
Meeting
Date
4/21/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
j
Item
Request to Approve a Resolution to Award the Big Boulder Bridge Procurement Contract to Contech Engineering
Order
10
Placement
Consent Agenda
Row ID
61782
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOARD OF COUNTY COMMISSIONERS <br />COUNTY OF KITTITAS <br />6YL17.���l�lrr[.j.9•l[e'yC�7�l <br />RESOLUTION NO. 2020 - <br />AWARDING CONTECH ENGINEERING THE PROCUREMENT CONTRACT FOR A <br />SIXTY FOOT METAL GIRDER BRIDGE FOR USE AT BIG BOULDER CREEK — CRP <br />#296-18 <br />WHEREAS: Public Works is finalizing Phase 2 construction plans and specifications <br />permanently replacing the failed wood bridge at Big Boulder Creek (CRP #296- <br />18); and <br />WHEREAS: Recognizing probable project impacts from the current ongoing COVID 19 <br />pandemic; and <br />WHEREAS: Public Works recently advertised for suppliers providing the required sixty -foot <br />metal girder bridge as a means of furthering the likelihood of successful <br />installation summer/fall of 2020; and <br />WHEREAS: The Engineer's estimate for the sixty -foot metal girder bridge structure published <br />advertising range was: $78,375-$86,625; and <br />WHEREAS: One supplier did respond with a quote of $75,969 but failed to provide the <br />required bid bond form; and <br />WHEREAS: The required bid bond was supplied in the response and Public Works desires the <br />Board of County Commissioners waive this slight bid irregularity allowing award <br />of the procurement contract to Contech Engineering; <br />NOW, THEREFORE BE IT RESOLVED that, pursuant to RCW 39.04.280, competitive <br />bidding is suspended as to this project. The COVID-19 outbreak has caused vast economic <br />disruption and damage due to the necessary social distancing precautions and associated <br />government -imposed lockdowns. This economic consequence is a part of the emergency. To <br />combat that aspect of the emergency the county wishes to stimulate the economy by continuing <br />to pursue various public works which are essential construction under the Governor's Stay At <br />Home Order. <br />BE IT FURTHER RESOLVED that the Board of County Commissioners, in the best interest <br />of the public, does hereby waive the bid bond form from Contech Engineering's procurement <br />advertisement response and award the Big Boulder Metal Girder Bridge procurement contract for <br />$75,969 to Contech Engineering. <br />
The URL can be used to link to this page
Your browser does not support the video tag.