My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2020-023 Vantage Highway Project
>
Meetings
>
2020
>
02. February
>
2020-02-04 10:00 AM - Commissioners' Agenda
>
Res-2020-023 Vantage Highway Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 10:43:21 AM
Creation date
2/12/2020 10:43:11 AM
Metadata
Fields
Template:
Meeting
Date
2/4/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
o
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Vantage Highway Project, CRP 298-19
Order
15
Placement
Consent Agenda
Row ID
59667
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency <br />Kittitas County <br />Right of Way <br />Project Title <br />Vantage Highway <br />❑✓ No Right of Way Needed ❑ Right of Way Needed <br />*All construction required by the ❑ No Relocation <br />contract can be accomplished <br />within the exiting right of way. <br />Railroad _ <br />❑✓ No railroad work required <br />[:]All railroad work will be completed prior to the start of <br />the construction contract <br />❑ Relocation Req <br />Date <br />1/16/2020 <br />Utilities <br />❑ No utility work required <br />❑✓ All utility work will be completed prior to the start <br />of the construction contract <br />❑ All utility work will be completed incoordination I ❑ All the railroad work will be completed incoordination <br />with the construction contract _ with the construction contract J <br />Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project <br />Utility adjustments needed will be identified when survey and preliminary design are done. The utility <br />companies will be notified of the conflicts and be required to either temporarily move or relocate their utility <br />out of the projects way prior to construction. It is anticipated that this will include communication and fiber <br />optic buried lines in conflict with guardrail post locations. <br />FAA Involvement <br />I Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ❑✓ No <br />FiRemarks <br />This project has been reviewed by the legislative body of the administration agency or agencies, or it's <br />designee, and is not inconsistent with the agency's comprehensive plan for community development. <br />Agent ittita County P I is W <br />Date �� J ��G� By - <br />ayorlCh airpersen <br />DOT Form 140-101 Page 3 <br />Revised 04/2015 Previous Editions Obsolete <br />
The URL can be used to link to this page
Your browser does not support the video tag.