Laserfiche WebLink
Agency Project Title Date <br />Kittitas County Vantage Highway 1/16/2020 <br />Right of Way <br />0✓ No Right of Way Needed ❑ Right of Way Needed <br />*All construction required by the ❑ No Relocation ❑ Relocation Required <br />contract can be accomplished <br />within the exiting right of way. <br />Utilities Railroad <br />❑ No utility work required ❑✓ No railroad work required <br />❑✓ <br />All utility work will be completed prior to the start ❑ All railroad work will be completed prior to the start of <br />of the construction contract the construction contract <br />F-1 All utility work will be completed in coordination ❑AII the railroad work will be completed in coordination <br />with the construction contract with the construction contract <br />Description of Utility Relocation orAdjustments and Existing Major Structures Involved in the Project <br />Utility adjustments needed will be identified when survey and preliminary design are done. The utility <br />companies will be notified of the conflicts and be required to either temporarily move or relocate their utility <br />out of the projects way prior to construction. It is anticipated that this will include communication and fiber <br />optic buried lines in conflict with guardrail post locations. <br />FAA Involvement <br />Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ❑✓ No <br />Remarks <br />This project has been reviewed by the legislative body of the administration agency or agencies, or it's <br />designee, and is not inconsistent with the agency's comprehensive plan for community development. <br />Agency Kittitas County Public Works <br />Date By <br />Mayor/Chairperson <br />DOT Form 140-101 Page 3 <br />Revised 0412015 Previous Editions Obsolete <br />