My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agreement
>
Meetings
>
2019
>
12. December
>
2019-12-03 10:00 AM - Commissioners' Agenda
>
Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 10:46:50 AM
Creation date
12/11/2019 10:46:12 AM
Metadata
Fields
Template:
Meeting
Date
12/3/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
k
Item
Request to Acknowledge FFY19 HSGP (SHSP) Homeland Security Grant Program Agreement #E20-087.
Order
11
Placement
Consent Agenda
Row ID
58292
Type
Grant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit C <br />WORK PLAN <br />FY 2019 Emergency Ma nagem ent Performance Grant <br />Emergency Management 0111anlzation Kittitas County Sheriff's Office <br />The purpose of EMPG Is to assist with the enhancement, sustainment and Improvement of state, local, and trlbal emergency management <br />programs. Activities conducted using EMPG funding should relate directly to the five elements of emergency management: prevention, <br />protection, response, recovery, end mitigation. Washington State does not require a specific number of activities to receive EMPG funding. <br />However, there are required capabllltles that must be sustained In order to remain ellglble for EMPG funding, lndudlng but not llmlted to <br />the ablllty to communicate and warn, educate the publlc, train and exercise, plan, and be NIMS compllant. The Work Plan delineates the <br />Emergency Management Organization's emergency management program planning and priority focus for this grant cycle (to Include <br />19EMPG grant and local funds). <br />l'rollr.:im /<rod 1/1 <br />rmerweMv COmmu nlCIOons <br />WORK PlANNED WHY THE WORK IS BEING DONE RESULT OF THE WORK <br />l Support the Everbrlde;e, mass notification system <br />for the County. <br />Emer1ency Mass notification Is new to the County The County wlll have a mass notification system In <br />(2019), Kittitas County has had a cap In mass place that all municipal EM and county EM will be <br />notifications for decades, with the new Everbrldce able to utilize In case of an emeraency. The county <br />- <br />Pm11r.1m Ama 112 <br />Training <br />WORK PLANNED <br />1. • Plan and Instruct active shooter training. <br />• Conduct and participate In EOC tralnln1. <br />• Continually train In Emergency Management (for <br />i hreats such HazMat) <br />l Support and participate In tralnln1s/conferences <br />(ICS 300, 400, HazMat, Active Shooter, WSEMA, <br />and PIEPC) Purchases will consist of markine <br />munitions, travel, and registrations costs. <br />T.11ctf(I I tt!l m boots <br />WORK PLANNED <br />system, that gap will be filled, will be able to notify citizens when emer1ency <br />situations are pendln1 and occurrlna; to help <br />reduce the potential ne1atlve Impacts to lives and <br />property, <br />WHVTHE WORK IS BEING DONE RESULT OFTHE WORK <br />Continual tr1lnlne ls .needed to be"er pfel)!lte flls! S(tlf are better prepared to handle response and <br />responders and EOC staff for emer,e11cl~, EOC operations, <br />threats, ind huard& that affect klttltuC01rnty <br />Numerous wlldland fires hal!c concluded ,th;it the <br />C(!unty ~ds a ·~eeptii' bench~ of EOC n_iem~ars <br />tralncll ln ICS..The reo1J-word actlvuhooter even t <br />on the ·cwu Clmpuse~po,ed ne.eded trelnlne In <br />reJpOMe_, <br />WHY THE WORK IS BEING DONE <br />The fundine will help supply needed tralnlne aids <br />and material, pay for registration and travel for <br />trainln1 so that the County will have enough ready <br />and trained staff to respond to emercenclu that <br />occur. <br />RESULT OF THE WORK <br />1. Purchase new boots for the reelonal tactical team The current footwear for the team Is obsolete and The regional tactical team will be equipped to be <br />able to responded to threats In Kittitas County. <br />The team will have the necessary supplies to <br />respond to threats for many years to come. <br />which will be used for tralnln1 and for mission-new boots will brldee this 1ap In response <br />specific SWAT operations such as e>Cploslv11 capabllittes. <br />response or chemical environment response. <br />Procram i\rt?n /Ill <br />Command vehicle <br />WORK PLANNED WHY THE WORK IS BEING DONE RESULT OF THE WORK <br />1. Purchase mobile command trays· modular The current vehlcle Is not equipped with the The new vehicle will be equipped to become a <br />cabinets for storace of computers, easels, and mobile command trays In the rear which severely mobile command post anywhere it can drive to. <br />other office related Items· for the new mobile Inhibits response capabilities. This will Increase the response capabllltyfor the <br />command vehicle for the emereency mana1ement emer1ency mana1ement coordinator to respond <br />coordinator. to any threat or hazard In the county. <br />DHS-FEMA-EMPG-FY 19 Page 21 of34 Kittitas County Sheriffs Office, E20-156
The URL can be used to link to this page
Your browser does not support the video tag.