Laserfiche WebLink
RESOLUTION NO. <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter <br />of initiating a county road project designated as: <br />CRP NO: 295-19 JOB NO: RC2090-FL <br />IT IS HEREBY RESOLVED that the Dickey Creek Bridge #16203 Replacement mile post 2.84-2.85; is established. <br />The Dickey Creek Bridge is functionally obsolete and currently load restricted. The project will replace the bridge with a <br />wider and longer structure that will safely provide access for all vehicles, bicyclists, and pedestrians, while reducing flood <br />impacts and restoring natural river processes. <br />ARTERIAL ❑ <br />ACCESS <br />This project is hereby declared to be a public necessity and the Director of Public Works serving as the County Engineer is hereby <br />ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). <br />IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the Director of <br />Public Works' estimate, is hereby made in the amounts and for the purposes shown: <br />PURPOSE <br />AMOUNT <br />TOTALS <br />PRELIMINARY ENGINEERING <br />$ 560,000 <br />CONSTRUCTION ENGINEERING <br />$ 100,000 <br />RIGHT-OF-WAY ACQUISITION <br />$ <br />SUB -TOTAL <br />F3,029,0000 <br />Count Forces CONSTRUCTION <br />$ <br />CONTRACT CONSTRUCTION <br />$ 3,029,000 <br />SUB -TOTAL <br />$ <br />TOTAL PROJECT COST <br />$ 3,689,000 <br />GRANT OR OTHER FUNDS <br />$ 3,191,000 <br />Grant Source: FLAP <br />Is <br />TOTAL COUNTY ROAD FUND ALLOCATION <br />498,000 <br />Mark Cook, P.E. <br />Interim County Engineer <br />® THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2020 ANNUAL ROAD PROGRAM AS <br />ITEM NO. 10 <br />❑ THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN <br />ACCORDANCE WITH RCW 36.81.130 <br />IT IS FURTHER RESOLVED THAT: <br />® THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. <br />❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND <br />WAC 136-18. <br />ADOPTED this day of , 2019. Attest: <br />BOARD OF COUNTY COMMISSIONERS ;Clerk of the Board <br />KITTITAS COUNTY, WASHINGTON <br />Cory Wright, Chair Brett Wachsmith, Vice -Chair Laura Osiadacz, Commissioner <br />g:\base\forms\eng\orp-frm <br />10/28/2019 <br />