Laserfiche WebLink
RESOLUTION NO. <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter <br />of initiating a county road project designated as: <br />CRP NO: 298-19 JOB NO: RC1913-11 <br />IT IS HEREBY RESOLVED that the Vantage Highway Overlay MP 21.25 - MP 27.51 <br />Vantage Highway (MP 21.25 - MP 27.51) received damage to the roadbed during windmill farm installation efforts. Public <br />Works has annually repaired rutting and asphalt failure since wind farm operations began several years ago. Work will <br />include an overlay of hot mix asphalt to provide a structural base for Vantage Highway. A companion project is planned <br />to replace guardrail in the road segment. <br />ARTERIAL <br />ACCESS ❑ <br />This project is hereby declared to be a public necessity and the Director of Public Works serving as the County Engineer is hereby <br />ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). <br />IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the Director of <br />Public Works' estimate, is hereby made in the amounts and for the purposes shown: <br />PURPOSE <br />AMOUNT <br />TOTALS <br />PRELMINARY ENGINEERING <br />s 175,000 <br />CONSTRUCTION ENGINEERING <br />s 25,000 <br />RIGHT-OF-WAY ACQUISITION <br />s 60,000 <br />SUB -TOTAL <br />s 260,000 <br />Is <br />County Forces CONSTRUCTION <br />$ <br />CONTRACT CONSTRUCTION <br />s 2,400,000 <br />SUB -TOTAL <br />2,400,000 <br />TOTAL PROJECT COST <br />s 2,660,000 <br />GRANT OR OTHER FUNDS <br />s 2,194,259 <br />Grant Source: RAP/HSI P <br />is <br />TOTAL COUNTY ROAD FUND ALLOCATION <br />475,741 <br />Mark Cook, P.E. <br />Interim County Engineer <br />® THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2020 ANNUAL ROAD PROGRAM AS <br />ITEM NO. 6 <br />❑ THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN <br />ACCORDANCE WITH RCW 36.81.130 <br />IT IS FURTHER RESOLVED THAT: <br />® THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. <br />❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND <br />WAC 136-18. <br />ADOPTED this day of 2019. Attest: <br />BOARD OF COUNTY COMMISSIONERS Clerk of the Board <br />KITTITAS COUNTY, WASHINGTON <br />Cory Wright, Chair Brett Wachsmith, Vice -Chair Laura Osiadacz, Commissioner <br />g:\base\forms\eng\crp-frm 10/28/2019 <br />