Laserfiche WebLink
1. RELEVANT CODE SECTIONS ANALYSIS FINDING <br />d. Provisions to assure permanence and maintenance of common open spaces; FOP states that this will be included in CCnRs <br />The following will be required as plat notes on all final plats: <br />Satisfied <br />e. Statement of intent including estimated cost for landscaping and restoration of natural areas despoiled by Applicant provided a statement of intent satisfying this requirement on August 24, Satisfied <br />construction including tree planting. 2018 (Index #27) <br />2. PRELIMINARY APPROVAL CONDTIONS (Ord. No.2006-60) ANALYSIS FINDING <br />Satisfied <br />a. The applicant shall adhere to all applicable regulations as set forth in the current Kittitas County Road <br />Condition will be addressed at time of final plat with a plat note Standards <br />b. No direct access to 1-90 or within the limited access boundaries of Huntzinger Road will be allowed Condition will be addressed at time of final plat with a plat note Satisfied <br />per WSDOT requirements <br />c. The North side of track F abuts WSDOT property on the North side. Access from the plat area to or Satisfied <br />across said WSDOT property shall be prohibited <br />Condition will be addressed at time of final plat with a plat note <br />d. It is the developers responsibility to dampen or deflect any 1-90 traffic noise for the development Condition will be addressed at time of final plat with a plat note Satisfied <br />e. Any outdoor advertising or motorist signage for this project shall comply with state criteria. The Condition shall be enforced through the counties' building permit process if Satisfied <br />applicant shall contact the WSDOT South Central Regional office for requirements structures require a permit <br />f. Site grading shall be designed so as not to reduce flood storage or conveyance capacity Condition will be addressed at time of final plat Satisfied <br />g. Mail routes shall be approved by the postmaster. The postmaster shall also approve mailbox Noted Satisfied <br />locations. Mailbox locations shall not create sight obstructions <br />h. Any proposed lighting should be shaded and directed down towards the site and away from I-90 A Note will be added to the plat indicating the lighting requirement. (Index #26, Satisfied <br />27) <br />i. Withdrawals of groundwater on the subject property shall be subject to the rules and regulations Condition will be addressed at time of final plat <br />Satisfied <br />adopted and administrated by the Washington State Department of Ecology <br />j. A minimum 80 foot buffer shall be maintained from the wetlands. Currently, the preliminary plat This needs to be address in the FOP, however the Buffer restoration plan will be Satisfied <br />depicts a buffer that is over 120 feet from the wetlands . Proper signage shall be incorporated and required prior to final plat. Site plan has been revised to include the 80' wetland <br />buffer, l 00 vear floodplain, and 200' SMP iurisdiction. Fencine: and Simae:e will <br />Page 3 revised/updated by Kittitas County 9/6/2019