My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage Bay PUD Final Development Plan Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-17 10:00 AM - Commissioners' Agenda
>
Vantage Bay PUD Final Development Plan Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 12:47:55 PM
Creation date
9/12/2019 12:41:27 PM
Metadata
Fields
Template:
Meeting
Date
9/17/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Closed Record Hearing to Consider the Vantage Bay PUD Rezone Final Development Plan (RZ-06-00025)
Order
1
Placement
Board Discussion and Decision
Row ID
56434
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />6. STAGING PLAN <br /> <br />Following is a staging plan describing the sequence of construction for all the elements <br />on the plans: <br /> Estimate of Phase 1 Construction Start Date June 2018 <br /> Phase 1 Construction June 2018 – June 2020 <br />o Pre-Construction Meeting <br />o Establish Clearing Limits and Install Temporary Sediment <br />and Erosion Control Measures <br />o Clearing, Grubbing, Grading <br />o Water Reservoir Construction <br />o Membrane Bio-Reactor Construction (Phased Installation) <br />o Utility Construction <br />o Roadway/Parking Construction <br />o Signage, Lighting, Landscaping and Vineyard Installation <br /> Lot and Building Construction June 2019 – June 2021 <br /> Final Stabilization and Finish Date June 2021 <br /> <br />Phase 2 <br /> Estimate of Phase 2 Construction Start Date June 2019 <br /> Phase 2 Construction June 2019 – June 2021 <br />o Pre-Construction Meeting <br />o Establish Clearing Limits and Install Temporary <br />Sediment and Erosion Control Measures <br />o Clearing, Grubbing, Grading <br />o Membrane Bio-Reactor Expansion (Phased Installation) <br />o Utility Extension <br />o Driveway/Parking Construction <br />o Signage, Lighting, Landscaping and Vineyards <br /> Hotel and Winery Construction June 2020 – June 2022 <br /> Final Stabilization and Finish Date June 2022 <br /> <br />Please note that subdivision lot sales may precede other elements of the development <br />upon final plat approval (KCC 17.36.040(1)). <br /> <br /> <br />7. SEPA MDNS CONDITIONS <br /> <br />Kittitas County issued conditions of approval with the SEPA Mitigated Determination of <br />Nonsignificance that were attached to the approved ordinance adopting the Preliminary <br />Plat and Planned Unit Development (Ord. 2006-060). Table 3.1 is provided to verify that the <br />alterations included with this FDP do not increase any environmental impacts taken into <br />consideration by the original SEPA threshold determination. <br /> <br /> <br /> <br /> <br /> <br />Index #2