My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage Bay PUD Final Development Plan Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-17 10:00 AM - Commissioners' Agenda
>
Vantage Bay PUD Final Development Plan Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 12:47:55 PM
Creation date
9/12/2019 12:41:27 PM
Metadata
Fields
Template:
Meeting
Date
9/17/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Closed Record Hearing to Consider the Vantage Bay PUD Rezone Final Development Plan (RZ-06-00025)
Order
1
Placement
Board Discussion and Decision
Row ID
56434
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Civil Engineering Land Surveying Project Management Public Works Land Planning Landscape Architecture <br />Phone 253.838.6113 800.345-5694 Fax 253.838.7104 <br />MBR Design Engineer: <br /> <br />To Be Determined: 2 Options <br /> <br />Option 1: <br />Name: James Hotchkies, Enereau Systems Group Inc. <br />Daytime Phone: (289) 321-0451 <br />Email Address: james.hotchkies@enereau.com <br /> <br />Option 2: <br />Name: Chris Porter, Whitney Equipment Company Inc. (WECI) partnered with AWC <br />Water Solutions Ltd <br />Mailing Address: 21222 30th Dr. SE, Ste 110 <br />City/State/ZIP: Bothell, WA 98021 <br />Daytime Phone: (206) 947-7087 <br />Email Address: cporter@weci.com <br /> <br />Site location information <br /> <br />Site Address: Huntzinger Rd, Vantage WA 98950 <br />Legal Description: A Portion of the East 1/2 of Section 30, Township 17 N, Range 26 E, <br />W.M., Kittitas County, Washington <br />County: Kittitas <br /> <br />Vicinity and site maps <br /> <br />See attached map. <br /> <br />Narrative <br /> <br />The Vantage Bay PUD originally was approved for 315-lot subdivision on 75.6 acres of <br />sloping land, of the 315 lots, 310 were approved for single-family residences with 5 <br />additional lots for amenities and infrastructure. However, this preliminary plat design did <br />not respect the existing topography, nor did it provide a variety of product types or <br />amenities that would be expected in a river-front resort community. Kittitas County <br />approved the minor alteration to decrease the acreage to 58.2 and the number of lots to <br />145. Of these 145 lots, no more than 40 are proposed to be single-family, attached <br />townhomes and the remaining 105 are proposed to vary in width and size. The <br />development is proposing amenities that include a private clubhouse, a community <br />garden and a barn to serve the residents. We are also proposing the addition of a <br />private winery with approximately 16 acres of vineyards, located in the southern portion <br />of the property. <br /> <br />Kittitas County code 17.36.040 final development plan requires certification from state <br />and local health authorities that water and sewer systems are available to accommodate <br />the development. As a condition of approval, a sewage disposal system will need to <br />serve the development. This project will use an on-site MBR packaged treatment plant. <br />MBRs share many of the same processes as traditional Activated Sludge Treatment <br />(AST) including: equalization, anoxic, and aerobic processes. However, instead of a <br />settler, there will be a membrane that filters the water before going through the UV <br />disinfection. This process uses much less space than an AST, and can be easily <br />enclosed in a building, which are the main reasons we picked an MBR. An alternative <br />was to install a lift station and force main to pump the effluent across I-90 to the existing <br />Index #6
The URL can be used to link to this page
Your browser does not support the video tag.