My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage Bay PUD Final Development Plan Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-17 10:00 AM - Commissioners' Agenda
>
Vantage Bay PUD Final Development Plan Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 12:47:55 PM
Creation date
9/12/2019 12:41:27 PM
Metadata
Fields
Template:
Meeting
Date
9/17/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Closed Record Hearing to Consider the Vantage Bay PUD Rezone Final Development Plan (RZ-06-00025)
Order
1
Placement
Board Discussion and Decision
Row ID
56434
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transportation Engineering NorthWest May 11, 2006 <br />Page 2 of 3 <br /> <br />Transportation Engineering/Operations ♦ Impact Studies ♦ Design Services ♦ Transportation Planning/Forecasting <br /> <br />816 6th Street South ♦ Kirkland, WA. 98033 ♦ Office (206) 361-7333 ♦ Fax (425) 889-TENW (8369) <br /> <br />Table 1 <br />Vantage Point – Trip Generation Summary <br /> Vehicle Trips1 <br />Time Period Entering Exiting Total <br />Weekday <br />Daily 755 755 1,510 <br />AM Peak Hour 39 59 98 <br />PM Peak Hour 76 66 142 <br /> <br />Saturday <br />Daily 745 745 1,490 <br />Peak Hour of the Generator 88 85 173 <br /> <br />1. Based on methodology documented in the Institute of Transportation Engineers (ITE) Trip <br />Generation Manual, 7th edition. <br />As shown in table 1, the greatest number of peak hour trips is estimated to occur on a <br />Saturday. During the peak hour of the generator on a Saturday, the Vantage Point <br />development is estimated to generate 173 peak hour trips (88 entering, 85 exiting). The <br />detailed trip generation calculations are included in Appendix A. <br />Project Trip Distribution <br />The distribution of project generated trips was based on the proposed developments <br />location in relationship to the I-90 on/off ramps. The proposed site is located within one <br />mile south of the I-90 ramps; therefore 90 percent of the project trips were assumed <br />to/from the north and 10 percent of the project trips were assumed to/from the south. <br />Turn Lane Assessment <br />The need for right and left-turn lanes along the project frontage on Huntzinger Road was <br />assessed based on guidelines included in the Washington State Department of <br />Transportation (WSDOT) Design Manual. Per your direction, future 2012 Average Daily <br />Traffic (ADT) volumes on Huntzinger Road were estimated based on a 2004 ADT count <br />provided by the Kittitas County (425 vehicles) with a 3 percent annual growth factor <br />applied. As a result, the 2012 ADT on Huntzinger Road was estimated to be 538 <br />vehicles (425 X 1.03^8). <br />Right-Turn Lanes on Huntzinger Road <br />The need for right-turn lanes on Huntzinger Road were assessed based on WSDOT <br />Design Manual figure 910-11 (see Appendix B). As shown on figure 910-11, a <br />minimum of 20 peak hour right-turns are needed before a right-turn pocket/taper or lane <br />would be considered. The estimated number of Saturday peak hour northbound right- <br />turns on Huntzinger Road entering the proposed site is 9 vehicles (10% of 88 entering <br />trips). Assuming all right-turning vehicles enter the site using only one of the two <br />Index #5
The URL can be used to link to this page
Your browser does not support the video tag.