My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage Bay PUD Final Development Plan Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-17 10:00 AM - Commissioners' Agenda
>
Vantage Bay PUD Final Development Plan Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 12:47:55 PM
Creation date
9/12/2019 12:41:27 PM
Metadata
Fields
Template:
Meeting
Date
9/17/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Closed Record Hearing to Consider the Vantage Bay PUD Rezone Final Development Plan (RZ-06-00025)
Order
1
Placement
Board Discussion and Decision
Row ID
56434
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.STATEMENTOF INTENT <br />The property owner and subsequent land developer will follow the approved plans, <br />adopted ordinance (Appendix A),and SEPA Mitigated Conditions of Approval (table 7.1) to <br />ensure that this Planned Unit Development does not harm or endanger the public safety <br />and welfare,nor will it create an environmental impact not already assessed at the time of <br />preliminary plat approval. <br />Civil construction plans will be designed to minimize disturbed areas.For areas that are <br />disturbed,the developer will utilize permanent erosion control measures such as <br />reseeding with hydro-seed or similar land cover. <br />Landscaping Costs are shown in Table 11.1 <br />Table 11.1 <br />Landscape Area Description Cost <br />Hotel and Winery Building $12-$15 per <br />Ph 2 <br />Façade Landscaping Square FootaseHotelandWineryParkingLot$5 -$7 per Square <br />Landscaping Foot <br />$261 per Tree orStreetTrees Along Intemal Street Tree +Labor $29-$32 perRoadsSquareFoot <br />Clubhouse and MBR Bldg.$12- $15 per <br />Facade Square FootLandscapingAround <br />Community Garden,Pool,Community Garden Landscaping L7$12 per Square <br />Clubhouse and MBR <br />Pool $5- $7 per Square <br />Foot <br />$186 per Tree orEvergreentreesplantedcloselyLandscapingAroundReservoirs$21-$25 pertogether for solid screen +labor Square Foot <br />Areas Despoiled by Construction $5 -$7 per Square <br />General Restoration not designated as Landscaped Foot <br />Area <br />BIPage <br />Index #27
The URL can be used to link to this page
Your browser does not support the video tag.