Laserfiche WebLink
FINALPLANNED UNITDEVELOPMENT(FPUD)1.RELEVANT CODESECTIONSANALYSISFINDINGAPPUCANTRESPONSEFinalDevelopmentPlan (KCC17.36.040 Existingatthe timeofapplicatlon,lastupdateOrd.N/ïN/A96-19)Followingapprovalof thepreliminarydevelopmentplanbythecountyandbeforelot salesorbuildingconstructioncommences,thedeveloper(owner)shallsubmitafinaldevelopmentplanforapprovalbytheboardofcountycommissionerswhichshallincludeallof thefollowing:a.Astaging plan describingthetimingorsequenceofconstructionforalltheelementsof Astaginghasbeen providedintheFDPthat satisfiesthisSatisfied stagingplanhasbeenrevised,theplan.Subdivisionlotsalesmayprecedeotherelementsofthedevelopmentupon requirement.However,staffsuggests thattheplanbereevaluatedreflecting general timeframes.final platapprovalandchangedtonotbedatespecific.b.Amapormapsof thesitedrawnatascalenosmallerthanonehundredfeettoonei.Potentialretentionpondsareshown,developmentNoti.Power detailisshownoninchshowingthefollowing:will beonprivatewell andsepticsystem.NeedtoSatisfiedtypicallotlayouts foundoni.Preliminary engineering plansincludingsitegrading,roadimprovements,showpowersheetDT-01.drainageandpublicutilitiesextensions;li.TypicalLotLayoutfor eachii.Arrangementofallbuildingswhichshallbeidentifiedbytype;ii.AllCommercialbuildingsareshownandlabeled,productfoundonsheetDT-lii.Preliminarybuildingplansincludingfloorplansandexteriordesignand/orstillneedtypicallotlayoutinformation01elevationviews;iii.Notediv.Locationandnumberofoff-street parkingareasincludingtypeandestimatediii.Sampleplansof thetownhouse/duplexstructures,iv.Noted,costofsurfacing;hotel, andsinglefamilyresidenceshavebeenv.Street sectionsandlotv.Thelocationanddimensionsofroadsanddrivewaysincludingtypeandprovidedand meetthenecessaryrequirementdrivewayinformationfoundestimatedcost ofsurfacingand roadmaintenanceplans;onsheetDT-01.vi.Thelocationandtotalareaofcommonopenspaces;iv.Requirementisaddressedonprovidedsite planvi.Commonspace tableisonvii.Proposed locationof fireprotectionfacilities;sheetST-01.viii.Proposedstormdrainageplan;v.Please providedrivewayinformationvil.FirehydrantlocationsfoundonsheetLIT-01vi.Pleaseprovidelocationsandlabelson site planviii.Noted.vii.Pleaseprovidelocationsandlabelson site planvili. PWcommentssubmittedJune15,2018PWwillassess theviabilityofstormwaterplanatthetimethecivilengineeringplanissubmitted.c.Certificationfrom stateand localhealthauthorities thatwaterandsewer systemsareInformationprovidedinAppendixEofFDPSatisfiedavailabletoaccommodatethedevelopment.d.Provisionsto assurepermanenceandmaintenanceofcommonopenspaces.FDPstatesthatthis willbeincludedinCCnRsSatisfiedThefollowingwillberequiredasplatnotesonallfinalplats:e.StatementofintentincludingestimatedcostforlandscapingandrestorationofnaturalNotad¯ressed¯NotEstimatedcostforlandscapingareasdespoiledbyconstructionincludingtreeplanting.Satisiledandrestorationhasbeen addedtoSection11intheFDP.Index #26