Laserfiche WebLink
DEPARTMENT OF PUBLIC WORKS <br />TO:Chelsea Benner,Planner i <br />COPY:Taylor Gustafson,Planner III <br />Sara Folk,PE,Engineering Services ManagerLindseyOzbolt,Planning Official <br />DATE:June 15,2018 <br />FROM:Mark R.Cook,Director/Acting County Engineer <br />RE:Vantage Bay Final Development Plan <br />We have evaluated the materials submitted supporting the submittat of the final developmentplanforVantageBayPUDandPreliminaryPlat.Our comments appear below for yourconsideration. <br />1 The conditions imposed by the Department of Public Works pursuant to an approvedroadstandardsvariancerequestgrantedtoMr.William Cowin (BCSCBN LLC)on11/15/17 will be evaluated at the time of final plat submittal.2.All preliminary plat and rezone conditions noted in Ordinance No.2006-60 will beevaluatedatthetimeoffinalplatsubmittal. <br />3.Transportation concurrency requirements will be applied at the time of final plat review.4.Parking requirements will be evaluated at the time of final plat submittal.Public WorksutilizesInternationalTransportationEngineers"Trip Generation Manual"(current edition)assigning daily and peak hour trip generations by land use code.5.All stormwater treatment and flow control devices will be evaluated for compliance at thetimeoffinalplatsubmittal. <br />6.AII retaining walls greater than four feet in height will provide engineering designs asappropriateforPublicWorksreview. <br />7.Portions of the proposed development appear to abut steep slopes (river bank).PublicWorkswillevaluatestructureplacementrelativetobankheightduringourreviewoffinalplatandnoticeofanybankstabilityconcerns. <br />411 N.Ruby,Suite #1 TEL (509)962-7523Ellensburg,WA 98926 FAX (509)962-7663 <br />Index #25