My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage Bay PUD Final Development Plan Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-17 10:00 AM - Commissioners' Agenda
>
Vantage Bay PUD Final Development Plan Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 12:47:55 PM
Creation date
9/12/2019 12:41:27 PM
Metadata
Fields
Template:
Meeting
Date
9/17/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Closed Record Hearing to Consider the Vantage Bay PUD Rezone Final Development Plan (RZ-06-00025)
Order
1
Placement
Board Discussion and Decision
Row ID
56434
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Management Implications <br />Based on the findings summarized above, EAS does not believe that any plant management implications <br />exist for plant species. Based on the data review, no rare or threatened state or federal plant species are <br />documented on BCSCBN, Inc. owned property or adjacent GCPUD property. <br /> <br />WETLANDS <br />Data Search and Field Reconnaissance <br />EAS reviewed the USFWS National Wetlands Inventory, Kittitas County Shoreline Master Program, <br />GCPUD Shoreline Master Plan, and GCPUD Wildlife Habitat Management Plan. EAS biologist/wetland <br />delineator John Nugent visited the site on 08/17/2017 to compare current conditions with those he had <br />observed during 2006. The site was generally the same as before; the wetland area was still present. <br /> <br />Findings <br />U.S. Fish and Wildlife Service National Wetlands Inventory <br />The National Wetlands Inventory was accessed on July 25, 2017 and classified the wetland area near the <br />project as Lake Wetlands (Attachment F). <br /> <br />Kittitas County Shoreline Master Program <br />The Kittitas County Shoreline Master Program (KCSMP) was updated and approved on March 7, 2016. <br />The KCSMP regulates wetland buffers for land development (See Table 5.2-1 from the KCSMP). Per <br />Table 5.2-1, the wetland category and intensity of use and development would determine the buffer <br />distance for the Vantage Bay Development. The wetland buffers are measured horizontally in all <br />directions from the regulated wetland edge as marked in the field. <br /> <br />In 2006, the functional analyses indicated that the adjacent wetland could qualify as a Category II or <br />Category III wetland if site-specific surveys for special status plant species were conducted and special <br />status plant species were present. No further delineations or rare plant evaluations were conducted in <br />2006 because the preliminary plat was over 120 feet from the wetlands area and did not intrude into the <br />most conservative Kittitas County Critical Areas Ordinance prescribed wetland buffer (80 ft). In 2006, <br />the minimum measurements between the BCSCBN, Inc. owned parcels and three wetland boundary <br />flags measured 139.03 ft, 125.80 ft, and 153.07 ft (Attachment A). <br />Index #9
The URL can be used to link to this page
Your browser does not support the video tag.