|
CHAPTER 5. CITY OF ROSLYN ANNEX
<br />7
<br />Table 5-7. Hazard Mitigation Action Plan Matrix
<br />Applies to new or
<br />existing assets
<br />Hazards
<br />Mitigated
<br />Objectives
<br />Met
<br />Lead
<br />Agency
<br />Estimated
<br />Cost
<br />Sources of
<br />Funding Timeline
<br />Initiative #R-1—Utilize and enhance existing programs to raise public awareness about natural hazards, the risk
<br />they pose and ways to reduce those risks.
<br />New and Existing All Hazards 1, 2, 3, 4, 5, 6,
<br />9
<br /> City Low General Fund Short-term,
<br />Ongoing
<br />Initiative #R-2—Maintain political support for hazard mitigation and response planning and programs by
<br />annually monitoring the progress of initiatives identified in this plan.
<br />New and Existing All Hazards 1, 2, 3, 4, 5, 9 City Low General Fund Short-term,
<br />Ongoing
<br />Initiative #R-3—Leverage mitigation opportunities by establishing and maintaining partnerships between public
<br />and private sectors
<br />Existing All Hazards 1, 5, 9 City Low General Fund Ongoing
<br />Initiative #R-4— Develop a continuity of operations plan and/or a post-disaster recovery plan to sustain
<br />operation of critical Town functions.
<br />New and existing All Hazards 1, 6, 9 City Medium General Fund,
<br />DHS grant
<br />funding
<br />Long-term,
<br />depends on
<br />funding
<br />Initiative # R-5—Replace vulnerable bridge crossings with restrained piping where feasible and cost-effective.
<br />Existing Flood, Dam
<br />Failure,
<br />Earthquake
<br />1, 7 City High Grants, Loans,
<br />Enterprise &
<br />Surplus Funds
<br />Short-term,
<br />Ongoing
<br />Initiative #R-6—Replace main transmission waterline (to bridge)
<br />Existing Earthquake 1, 7 City $2,000,000,
<br />High
<br />Grants, Loans,
<br />Enterprise &
<br />Surplus Funds
<br />Short-term
<br />Initiative #R-7—Replace main transmission waterline (bridge to treatment plant)
<br />Existing Earthquake 1, 7 City High Grants, Loans,
<br />Enterprise &
<br />Surplus Funds
<br />Long-term,
<br />depends on
<br />funding
<br />Initiative #R-8—Replace main transmission waterline (treatment plant to reservoir)
<br />Existing Earthquake 1, 7 City High Grants, Loans,
<br />Enterprise &
<br />Surplus Funds
<br />Long-term,
<br />depends on
<br />funding
<br />Initiative #R-9—Complete replacement of pinch point (stormwater system) at Penn Place Apartments
<br />New and Existing Flooding 1, 7, 8 City High Grants, Loans,
<br />Enterprise &
<br />Surplus Funds
<br />Short-Term,
<br />depends on
<br />funding
<br />Initiative #R-10—Replace V-ditch catch basins with Type-40 catch basins
<br />New and Existing Flooding 1, 7, 8, 10 City Medium Grants, Loans,
<br />Enterprise &
<br />Surplus Funds
<br />Short-term,
<br />Ongoing
<br />Initiative #R-11—Replace trunk lines and add access points for stormwater system
|