Laserfiche WebLink
<br />A-3 <br />G. After participation in the mandatory template workshop, each partner will be required to complete <br />their template and provide it to the planning team in the time frame established by the Steerin g <br />Committee. Failure to complete your template in the required time frame may lead to <br />disqualification from the partnership. <br />H. Each partner will be expected to perform a “consistency review” of all technical studies, plans, <br />ordinances specific to hazards to determine the existence of any not consistent with the same such <br />documents reviewed in the preparation of the County (parent) Plan. For example, if your <br />community has a floodplain management plan that makes recommendations that are not consistent <br />with any of the County’s Basin Plans, that plan will need to be reviewed for probable incorporation <br />into the plan for your area. <br />I. Each partner will be expected to review the Risk Assessment and identify hazards and <br />vulnerabilities specific to its jurisdiction. Contract resources will provide the jurisdiction specific <br />mapping and technical consultation to aid in this task, but the determination of risk and vulnerability <br />will be up to each partner. <br />J. Each partner will be expected to review and determine if the mitigation recommendations chosen <br />in the parent plan will meet the needs of its jurisdiction. Projects within each jurisdiction consistent <br />with the parent plan recommendations will need to be identified and prioritized, and reviewed to <br />determine their benefits vs. costs. <br />K. Each partner will be required to create its own action plan that identifies each project, who will <br />oversee the task, how it will be financed and when it is estimated to occur. <br />L. Each partner will be required to sponsor at least one public meeting to present the draft plan to its <br />constituents at least 2 weeks prior to adoption. <br />M. Each partner will be required to formally adopt the plan. <br />Templates and instructions to aid in the compilation of this information will be provided to all committed <br />planning partners. Each partner will be expected to complete their templates in a timely manner and <br />according to the timeline specified by the Steering Committee. <br />** Note**: Once this plan is completed, and DMA compliance has been determined for each partner, <br />maintaining that eligibility will be dependent upon each partner implementing the plan <br />implementation-maintenance protocol identified in the plan. At a minimum, this means completing <br />the on-going plan maintenance protocol identified in the plan. Partners that do not participate in this <br />plan maintenance strategy may be deemed ineligible by the partnership, and thus lose their DMA <br />eligibility. <br />