CHAPTER 18. AREA-WIDE MITIGATION INITIATIVES <br />18-1 <br />CHAPTER 18. <br />AREA-WIDE MITIGATION INITIATIVES <br /> <br />18.1. SELECTED COUNTY-WIDE MITIGATION INITIATIVES <br />The planning partners and the steering committee determined that some initiatives from the mitigation <br />catalogs could be implemented to provide hazard mitigation benefits countywide. Table ES-1-1 lists the <br />recommended countywide initiatives, the lead agency for each, and the proposed timeline. The parameters <br />for the timeline are as follows: <br />• Short Term = to be completed in 1 to 5 years <br />• Long Term = to be completed in greater than 5 years <br />• Ongoing = currently being funded and implemented under existing programs. For this update, <br />an effort was made to look more closely at the ongoing activities, in the context of the five - <br />year planning horizon of this plan. <br />The mitigation initiatives from the 2012 plan were reviewed by the full committee for status and <br />progress made. The steering committee decided that all seven previous initiatives should be <br />continued in the 2019 plan update. <br />Table 18-2 shows the status of each of the 2012 mitigation initiatives at the time of the 2019 plan <br />update. <br />18.2. BENEFIT/COST REVIEW <br />44 CFR requires the prioritization of the action plan according to a benefit/cost evaluation of the proposed <br />projects and their associated costs (Section 201.6.c.3iii). The benefits of proposed projects were weighed <br />against estimated costs as part of the project prioritization process. The benefit/cost analysis was not of the <br />detailed variety required by FEMA for project grant eligibility under the Hazard Mitigation Grant Program <br />(HMGP) and other HMA programs . Alternatively, a review of the apparent benefits versus the apparent <br />cost of each project was performed. Parameters were established for assigning subjective ratings (high, <br />medium, and low) to the costs and benefits of these projects. <br />Cost ratings were defined as follows: <br />• High—Existing funding will not cover the cost of the project; implementation would require <br />new revenue through an alternative source (for example, bonds, grants, and fee increases). <br />• Medium—The project could be implemented with existing funding but would require a re- <br />apportionment of the budget or a budget amendment, or the cost of the project would have to <br />be spread over multiple years. <br />• Low—The project could be funded under the existing budget. The project is part of or can be <br />part of an ongoing existing program. <br />Benefit ratings were defined as follows: <br />• High—Project will provide an immediate reduction of risk exposure for life and property. <br />• Medium—Project will have a long-term impact on the reduction of risk exposure for life and <br />property, or project will provide an immediate reduction in the risk exposure for property.