Laserfiche WebLink
Phase 3 Divisions 15 & 16 Project Narrative <br />(3)A statement describing the development plan in relationship to adjacent development <br />and natural features. <br />The Phase 3 Divisions 15 &16 project site consists of relatively flat terraces that slope to the <br />southeast. The divisions are located at the west end of Tumble Creek Drive, northwest of <br />Divisions 6-9 and the Tumble Creek Golf Course. <br />(4)A description of the Master Planned Resort Accommodation Units (including Short- <br />Term Visitor Accommodation Units),Visitor-Oriented Amenities,developed On-Site <br />Recreational Facilities,Open Space and other Permitted Uses proposed bv Trendwest for <br />the Resort area encompassed within the Site DevelopmentPlan. <br />This Site Development Plan includes 105 detached resort residential lots spaced on 293.03 acres <br />and associated roadways.Also included are a lake amenity and open space and service tracts. <br />(5)A description of plans for landscaping (including tree planting)and restoring natural <br />areas affected bv construction and plans for the preservation of Open Space. <br />Since this Site Development Plan is consistent with the approved LSP and Phase lA,Addendum <br />an amendment specific to this plan has not been submitted. The following activities, which are <br />discussed in more detail below,will implement the approved Land Stewardship Plan (LSP)by <br />Raedeke Associates, Inc. completed February 2018. <br />1)Road edges <br />2)Areas around the homes <br />Road edges and drainage ditches <br />These disturbances will appear in the form of cut and fill banks.Generally,the approach to their <br />restoration will be by hydro seeding of an approved mix,with an optional application of <br />wildfloweroverseed. <br />Unirrigated sites <br />Where landscapes are installed (including hydro seeded areas)"establishment"watering will <br />occur,as needed to reestablish desired vegetation cover levels.For a period of two growing <br />seasons following installation,hand watering with a watering truck may be provided,as <br />necessary.Also as necessary,a second hydroseed application a year after the first application <br />may be completed,to obtain the desired vegetation cover along the road edge. <br />Open Space <br />February 2019 Project Narrative-Site Development Plan <br />Phase 3 Divisions 15 & 16 <br />Page 3 of 5 <br />Index #4