Laserfiche WebLink
Part 5 Sewer System Plan <br />General Description <br />The Phase 3 Divisions 15 &16 project consists of 105 detached resort residential vacation <br />homes spaced on 293.03 acres. <br />The collected raw wastewater from developed portions of the site will be conveyed by means <br />of onsite gravity sewer along the proposed roadways.The eastern portion of the gravity sewer <br />main (approximately 2,700 feet along the proposed Easton Ridge Trail roadway)has already <br />been installed as part of Phase 3 Division 9.Due to the site's topography,a small portion of the <br />lots may require grinder pumps. <br />Wastewater will continue further to off-site gravity sewers to the Waste Water Treatment Plant <br />(WWTP)in Cle Elum. <br />Februan 2019 Phase 3 Divisions 15 &16 En.gineering Summan <br />ESM Consulting Engineers,L.L.C.5 -1 <br />\\Esm8\engr\ESM-JOBS\998\718\016\document\P3D15&16 Eng Summ_Part 5.doc <br />Index #11