My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-03 2:00 PM - 2:00pm Public Hearing
>
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2019 12:09:06 PM
Creation date
8/29/2019 12:02:08 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2019
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Suncadia Phase 3 Divisions 15 & 16 Preliminary Plat.
Order
1
Placement
2:00pm Public Hearing
Row ID
56118
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment to <br />SEPA Environmental Checklist <br />Phase 3 Divisions 15 &16 <br />Introduction <br />This attachment contains information requested on the Kittitas County SEPA Environmental <br />Checklist which exceeded the area provided in the form. <br />A.BACKGROUND <br />3.LIST ANY ENVIRONMENTAL INFORMATION YOU KNOW ABOUT THAT HAD BEEN <br />PREPARED, OR WILL BE PREPARED,DIRECTLY RELATED TO THIS PROPOSAL. <br />The following environmental information has been preparedfor the Suncadia MPR Project: <br />·MountainStar Master Planned Resort Draft Environmental Impact Statement,Volumes I-III, <br />July 1999.("DEIS") <br />·MountainStar Master Planned Resort Final Environmental Impact Statement,Volumes 1-4, <br />April 2000.("FEIS") <br />·MountainStar Master Planned Resort Environmental Impact Statement Addendum, March <br />2002. ("EIS Addendum") <br />·MountainStar Properties/CleElumUrban Growth AreaFinal EnvironmentalImpact Statement, <br />February2002. ("Cle Elum FEIS") <br />B.ENVIRONMENTALELEMENTS <br />1.EARTH <br />d.Are there surface indications or history of unstable soils in the immediate vicinity? <br />Potential landslide hazards are discussed in Sections 3.1 and 4.1 and Appendix B of the MPR DEIS. <br />Phase 3 Divisions 15 &16 plat has been mapped on the LandslideHazard Map as Zone 4 "Low <br />HazardRisk"and on the ErosionHazard Map as Zone 5 "Low Hazard Risk". Adjacent to the Phase <br />3 Divisions 15 &16 plat there are some steep slope areas marked on the ErosionHazard Map as <br />Zone 1 "High to Severe HazardRisk". <br />e.Describe thepurpose,type,and approximate quantities ofany filling or grading proposed. <br />Indicate source offill. <br />For Phase 3 Divisions 15 &16 lot, lake amenity,access and utility infrastructure construction,the <br />estimated grading quantities are approximately 48,700 cubic yards of cut and approximately 54,400 <br />cubic yards of fill.Materials for utility backfill and road base would be imported from offsite <br />Incomplete or illegible applications will be returned. KCPD 2-02 <br />Index #8
The URL can be used to link to this page
Your browser does not support the video tag.