My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-03 2:00 PM - 2:00pm Public Hearing
>
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2019 12:09:06 PM
Creation date
8/29/2019 12:02:08 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2019
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Suncadia Phase 3 Divisions 15 & 16 Preliminary Plat.
Order
1
Placement
2:00pm Public Hearing
Row ID
56118
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g.Will the proposal interfere with,affect or be affected by the movement of agricultural and forest products <br />on roads or streets in the area?If so,generally describe.ggig.] <br />No. <br />h.Proposed measures to reduce or control transportation impacts,if any:ggIp_] <br />Please refer to the MPR Conditions of Approval,Sections C-1 through C-20B. <br />15.Public Services thelol <br />a.Would the project result in an increased need for public services (for example:fire protection,police <br />protection,public transit, health care,schools,other)?If so,generally describe.fhelol <br />There would be a small increase in demand for fire and police protection,schools,and health care facilities. <br />b.Proposed measures to reduce or control direct impacts on public services,if any.Belpl <br />Measure6 Bre Outlined in the MPR Conditions of Approval,Sections C-30 through C-47 would reduce impacts. <br />16.Utilities thelo1 <br />a.Circle utilities currently available at the site:Belg] <br />electricity,natural gas, water,refuse service, telephone,sanitary sewer,septic system, <br />other <br />Electricity,natural gas,water,refuse service,telephone,and sanitary sewer are available at the site. <br />b.Describe the utilities that are proposed for the project, the utility providingthe service, <br />and the general construction activities on the site or in the immediate vicinity which might <br />be needed.gg] <br />Electricity,natural gas,telephone cable television,refuse,water,and sewer services are proposed at the site. <br />C.Signature lhelD1 <br />The above answers are true and complete to the best of my knowledge.I understand that the lead <br />agency is relying on th to make its decision. <br />Signature:' <br />Name of signee FL x £5 <br />Position and Agency/Organization VICE /Jeg sodEAT~ <br />Date Submitted:2.þo ji <br />D.supplementalsheet for nonproject actionshelp] <br />(IT IS NOT NECESSARY to use this sheet for project actions) <br />Because these questions are very general,it may be helpful to read them in conjunction <br />with the list of the elements of the environment. <br />When answering these questions,be aware of the extent the proposal,or the types of <br />activities likely to result from the proposal,would affect the item at a greater intensity or <br />at a faster rate than if the proposal were not implemented.Respond briefly and in general terms. <br />SEPA Environmental checidist (WAC 197-11-960)July 2016 Page 11 of 13 <br />Index #8
The URL can be used to link to this page
Your browser does not support the video tag.