My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-03 2:00 PM - 2:00pm Public Hearing
>
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2019 12:09:06 PM
Creation date
8/29/2019 12:02:08 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2019
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Suncadia Phase 3 Divisions 15 & 16 Preliminary Plat.
Order
1
Placement
2:00pm Public Hearing
Row ID
56118
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 |Page <br />This comment has been addressed. <br />6.Widths of the AC parcels shall be included. <br />This comment has been addressed. <br />7.Address the requirements of WAC 332-130-145 <br />This comment has been addressed. <br />8.On Sheets PP-06 and PP-07 the dashed line on Easton Ridge Trail is not identified. Is it an <br />Easement? <br />This comment has been addressed. <br />Engineering: <br />1.Internal roads shall meet the minimum requirements of Exhibit J of the approved Master <br />Plan Development Agreement. <br />The internal roads have been designed to meet these requirements as described in the <br />Site Development Plan notebook. <br />2.Prior to final plat, an accounting of water and sewer connections shall be provided to <br />Public Works.The accounting will specifically identify approved capacity and state the <br />number of connections being allowed for use by Divisions 15 and 16. <br />This information will be provided by Suncadia as requested. <br />3.5tormwater design will be consistent with the approved Master Plan Development <br />Agreement. <br />The stormwater design meets tis requirement as described in the Site Development <br />Plan notebook. <br />4.Prior to final plat, Public Works will review traffic analysis obligations for the approved <br />Master Plan Development and advise if a transportation concurrency evaluation will be <br />required for the project. <br />This comment has been noted. <br />Index #32
The URL can be used to link to this page
Your browser does not support the video tag.