Laserfiche WebLink
Phase 3 Divisions 15 &16 Project Narrative <br />(10)Results of monitoring as required bv the MountainStarMPR Conditions and Section <br />4.1(g)(4) above as of the date of submittalof the Site Development Plan. <br />Monitoring reports as required by the MountainStar MPR Conditions,specifically Section E- <br />1(a), and Section 4.l(g)(4) of the Development Agreement are on-going and are to be reviewed <br />prior to or concurrent with SDP approval and final consistency review. <br />(11)A statement identihing any deviation(s) between such plan and the MountainStar <br />Resort ConceptualMaster Plan or,alternatively,and if applicable,an approved General <br />Site Plan. <br />There are no deviations between the Phase 3 Site Development Plan approved March 16,2004 <br />and the proposed development,other than roadway and lot configurations that have been slightly <br />altered. <br />(12)Anv appropriate environmentaldocumentation. <br />Environmental documentation for this Site Development Plan is provided by the SEPA checklist <br />submitted concurrent with this SDP.No additional environmental review is required. <br />Fe brua >2019 Project Narrative-Site Development Plan <br />Phase 3 Divisions 15 & 16 <br />Page 5 of 5 <br />Index #4