My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2019-126
>
Meetings
>
2019
>
08. August
>
2019-08-06 10:00 AM - Commissioners' Agenda
>
Res-2019-126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2019 9:21:10 AM
Creation date
8/13/2019 9:20:51 AM
Metadata
Fields
Template:
Meeting
Date
8/6/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
r
Item
Request to Approve a Resolution In the Matter of Approval of the Final Development Plan for Dunford Planned Unit Development (RZ-07-00008& LL-08-00002).
Order
18
Placement
Consent Agenda
Row ID
55546
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approval for the Final Development Plan, the four-lot short plat associated with this PUD will be <br />completed and filed with the Kittitas County Auditor's Office. <br />Stage 2 will include logging as required for the road right of way and may include logging of <br />building sites and complete fire wise activity in parts of the development. <br />Stage 3 will include, but not be limited to, the construction of the domestic water system, the <br />intersection of the internal road system with State Highway 97, the construction of a portion the <br />internal road system and the construction of the dry utilities as required. <br />Stage 4 will include the construction of a portion of the recreational facilities possibly including <br />but not limited to trails, barns, arenas, recreational center, model home and sales office. <br />Stage 5 will include the final platting, development and sale of Lots 1-5 and 58-65 including the <br />associated construction requirements including but not limited to road construction, storm water <br />construction, dry and wet utilities, and additional recreational facilitates. <br />Stage 6 will include the final platting, development and sale of Lots 6-9 and 55-57 including the <br />associated construction requirements including but not limited to road construction, storm water <br />construction, dry and wet utilities, and additional recreational facilitates. <br />Stage 7 will include the final platting, development and sale of Lots 10-13 and 52-56 including <br />the associated construction requirements including but not limited to road construction, storm <br />water construction, dry and wet utilities, and additional recreational facilitates. <br />Stage 8 will include the final platting, development and sale of Lots 14-17 and 48-51 including <br />the associated construction requirements including but not limited to road construction, storm <br />water construction, dry and wet utilities, and additional recreational facilitates. <br />Attachment C
The URL can be used to link to this page
Your browser does not support the video tag.