Laserfiche WebLink
permitted construction sites. These control measures must be able to prevent soil from being This will be required prior to final plat approval. <br />carried into surface water (this includes storm drains) by stormwater runoff. Permit coverage <br />and erosion control measures must be in place prior to any clearing, grading, or construction. <br />B.41 Washington Administrative Code (WAC) 173-400-040 requires that reasonable precautions be The applicant states that Dunford Planned Unit Development is in Satisfied <br />taken to prevent dust from leaving the site. Also, dust is prohibited from interfering unreasonably agreement to this. <br />I with the use and enjoyment of property, causing health impacts, or damaging property or business. <br />I B.42 An approved private fire hydrant system shall be installed. The hydrant system shall be subject to plan Fire Marshal approves submitted materials at this stage. Future Satisfied: Fire Marshal <br />review through the Fire Marshal 's Office and shall be subject to an annual Operational Permit. permits will require additional Fire Marshal review. approved <br />B.43 Water storage and hydrant spacing shall comply with the International Fire Code. Fire Marshal approves submitted materials at this stage. Future Satisfied: per Fire <br />permits will require additional Fire Marshal review. Marshal <br />B.44 The minimum flow requirements for the residential structures shall be no less than 1,000 gallons Fire Marshal approves submitted materials at this stage. Future Satisfied <br />per minute. pennits will require additional Fire Marshal review. Documentation <br />of this condition must be met prior to final plat approval. <br />B.45 The minimum road width shall not be less than 26' in width. The applicant states that the Dunford Planned Unit Development is in Satisfied <br />agreement to this unless circumstances warranted otherwise. This will <br />be required for and reviewed prior to final plat approval. The <br />condition requires road width to be no less than 26' in width, the <br />applicant with have to work with Public Works in the case this is <br />not achievable and go through the necessary permitting <br />requirements at that time. <br />B.46 A minimum of two fire apparatus access roads are required. The two access roads shall be not less than ½ Fire Marshal approves submitted materials at this stage. Future Satisfied: Fire Marshal <br />the length of the maximum diagonal dimension of the property, measured in a straight line between permits will require additi onal Fire Marshal review . approved with <br />accesses. emergency access. <br />B.47 If the Fire Marshal determines that Section Dl07 of the International Fire Code applies, the Fire Marshal Fire Marshal approves submitted materials at this stage. Future Satisfied: Fire Marshal <br />shall determine whether or not any of the exceptions ofD107.0l apply to this project. permits will require additional Fire Marshal review. approved <br />B.48 No fire apparatus access lane shall have a slope greater than 12%. The applicant did not provide any documentation on this requirement. Satisfied <br />More information will be needed. This will be required for and <br />reviewed prior to final plat approval. <br />B.49 "No Parking-Fire Lane" signs must be posted per Fire Marshal requirements. This will be required prior to final plat approval. Satisfied <br />B.50 All cul-de-sacs must have a minimum turning radius of no less than 50' The signs mentioned above This will be required and reviewed prior to final plat approval. Satisfied <br />shall be posted on all cul-de-sacs. <br />B.51 Co llSlnlClion documents for the proposed fire apparatus access, fire lanes and hydraulic calculations Dunford Planned Unit Development is in agreement with this. Satisfied <br />for the hydrant system shall be submitted to the Fire Marshal 's Office for review prior to construction. Furthermore hydraulic calculations and hydrant systems will be <br />designed pursuant to the Washington State Department of Health <br />Group A water system requirements, as the State is the permitting <br />authority. With regards to fire apparatus access, and fire lanes these <br />will be part of the road design. All of the aforementioned will b e <br />submitted to the Fire Marshall for review. This will be required for <br />and reviewed prior to f"mal plat approval. <br />B.52 All development, design and construction shall comply with Kittitas County Code, Kittitas County Dunford Planned Unit Development is in agreement to this. Satisfied <br />Zoning and the 2006 International Fire & Building Codes. <br />Page 10 revised/updated by Kittitas CounA'tflj'Yrt+iih't 8