My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord-2019-010
>
Meetings
>
2019
>
06. June
>
2019-06-18 10:00 AM - Commissioners' Agenda
>
Ord-2019-010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 10:02:18 AM
Creation date
6/25/2019 9:55:53 AM
Metadata
Fields
Template:
Meeting
Date
6/18/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
h
Item
Request to Approve an Ordinance Adopting the 2017-2037 Comprehensive Plan Periodic Update and Associated Maps
Order
8
Placement
Consent Agenda
Row ID
54424
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Education -Central Washington Resource Energy <br />Collaborative Center <br />\ Vicinity Map , <br />BENDER RO <br />Project Information and Selection Criteria <br />Location Bowers Field Industrial Park, Ellensburg <br />Links to Other Proieas or Facilities NIA <br />Economic Development Group (EOG) of Kittitas <br />County will construct a new facility in the designated <br />IPZ Development Zone to provide office space for the <br />Central Washington Resource Energy Collaborative <br />Description Center (CWREC). <br />The newly created CWREC requires office space for its <br />program to advance low-carbon energy technology and <br />attract firms that support renewable energy services <br />Justification (Need/Demand) and professional research. <br />Established LOS: NIA <br />Level of Service (LOS) I f>r0jec_t Tvoe Project Type: New Facility <br />C omprehensive Plan Citations GPOS.26 <br />Capital Cost 2015 2016-2020 Total <br />DesiJm and E nRineerinJ? <br />Construction To be determined To be determined <br />TOTAL To be determined To be determined <br />Funding Sources 2015 2016-2020 Total <br />EBDA and CERB loans To be determined To be determined <br />TOTAL To be determined To be determined <br />Annual Operations and Maintenance <br />Currently, the County does not track maintenance costs <br />Estimated Costs for these improvements. <br />Estimated Revenues None <br />Antfcipated Savings Due to Project None <br />Department Responsible for <br />Operations Facilities and Maintenance
The URL can be used to link to this page
Your browser does not support the video tag.