Laserfiche WebLink
I 1ll•1," •• 1 ,ly I 111,1 ,, rt pr 1 •:,:11, ,, I (1l!JI m I l v .. m iC I ,, <br />Regional Parks and Trails -Tourism Infrastructure Plan <br />Vicinity Map unavailable at this time <br />Project Information and Selection Crlterta <br />Location <br />Links to Other Prc,jem or Facilities <br />Description <br />Justification (Need/Demand) <br />Level of Service (LOS) I Project <br />Type <br />Comprehensive Plan Citations <br />Level of Service (LOS) I Project <br />e <br />Capital Cost <br />Master Plan I Conceptual Site Plan <br />Design and En$!ineerillK <br />Construction <br />TOTAL <br />Funding Sources <br />Paths & Trails Gas Tax Reserve <br />TOTAL <br />Locations very <br />NIA <br />Develop a master plan for tourism infrastructure . <br />A master plan is needed to determine tourism <br />infrastructure needs and prioritization for <br />implementation . This work is expected to be completed <br />in 2016. <br />Established LOS: NIA <br />Project Type: New facility <br />GPO 5.26 <br />Established LOS: NIA <br />Project T Ian <br />GPO 5.26 <br />2015 2016-2020 Total <br />$50,000 $50 ,000 <br />$50,000 $50,000 <br />2015 2016-2020 Total <br />$50,000 $50,000 <br />$50,000 $50,000 <br />Annual Operations and Maintenance <br />Currently, the County does not track maintenance costs <br />Estimated Costs for these improvement<;. <br />Estimated Revenues None <br />Anticipated Savin~s Due to P roject None