Laserfiche WebLink
r .. • ,. 1 .. {1,A <br />Table 1 continued -Six-Year Plan Summary <br />2015-2020 Summary Kittitas County Public Facility Projects <br />Chip Seal-7 Year Cycle Locations vary -approx. Local Rd Funds 2015-2020 $16,182,000 70 miles per year. and CAPP <br />Turn-A rounds Various Locations Local Rd Funds 2015-2020 $138,000 Countywide <br />Hard Surface Gravel Various Locations Local Rd Funds 2015-2020 $684,000 Roads <br />Cle Elum Pedestrian S. Cle Elum Bridge Unknown 2020 $1,250,000 Bridge Vicinity <br />6. Regional Parks and Trails <br />Project Name Location & Descriplion Funding Source Schedule Total Cost <br />Cle Elum Pedestrian S. Cle Elum Bridge Non-motorized 2020 $1,250,000 Bridge vicinity & Rd Fund <br />Hansen Pits Park Master W . ofTjossem Rd/ Paths & Trails 2016-2020 $25,000 Plan Canyon Rd . intersection gas tax reserve <br />Tourism Infrastructure Various Locations Lodging Tax 2015-2016 $50,000 Plan <br />7. Solid Waste <br />Project Name Location & Description Fundi1 1R. Source Schedule Total Cost <br />Re locate Eburg Transfer l.oca tion to be Solid Waste 2015-2020 $5,250,000 Station/C ompost Facilit y determined Fund <br />8. Library Services -No Projects Planned for 2015-2020 period <br />9. Emergency Services <br />Pr ojec r Name Location & Description F.1111dinJ;r Source Schedule Total Cost <br />Station 21 Upgrade 2020 Vantage Highway, Bonds 2016-2020 $2,500,000 Ellensburg <br />400 E . Mt. View, General <br />Station 29 Relocation Obligation 2015-2020 $6,000,000 Ellensburg Bonds <br />Emergency Animal Kittitas Valley Event General Fund 2016-2020 $500,000 Shelter Center/ Fairgrounds <br />10.Education <br />Proie ct Name Location & Descr(ption Fu11dit1!{ Source Schedule Total Cost <br />Central WA Resource Bowers Field Industrial EBDA and To Be Energy Collaborative Park, Ellensburg CERBLoan 2016-2020 Determined Center <br />11.Water-Group A Systems -No Projects Planned for 2015-2020 period <br />12.Sanitary Sewer -No Projects Planned for 2015-2020 period