Laserfiche WebLink
Filed for Record 04/16/2009 04 :48:53 PM -Kittitas County, WA Auditor -200904160090 Page 110 of 118 <br />EXHBIT J (Rev. 1) to Development Agreement <br />Development Standards and Design Guidelines for <br />MountainStar Master Planned Resort <br />Decem her 2, 2008 <br />TABLE 2-SUNCADIA PATH ANO TRAIL MATRIX (5/18/07) <br />PAVED PATH TRAIL NATURE <br />TRAIL <br />Uses-Pedestrians , ( I )Pedestrians , fat ( I ) Pedestrians <br />Summer/Spring/Fall wheelchairs , bicycles , tire bicycles, fat tire <br />strollers, rollerblades, strollers <br />skateboards <br />Uses-Winter Pedestrians, CC skiing (I) CC skiing and ( I ) Pedestrians <br />and snow shoeing on snow shoeing on <br />selected path segments selected trails <br />Molorized vehicle Maintenance, security, Maintenance , NA <br />use Emergency Services, security, Emergency <br />Mechanized track Services , <br />cutting Mechanized track <br />cutting <br />Max. Percentage 5%(2) 12% max. desired, <40% <br />Grade Exceotions to 20% <br />Width 10 ' (Pavement) 4'-8 ' 2'-4' <br />Shoulder width I ', transitions from NA NA <br />asohalt to grade. <br />Vegetation 5' to limbs and shrubs , 2'-5' to limbs and 0 <br />Clearance, 1 '-2' for trees shrubs . <br />Horizontal I '-2' to trees <br />Vegetation IO', for a width of +/-10' 8' <br />Clearance. Vertical 14' <br />Base material 4" crushed rock, to Native/ex isting soil Native/existing <br />extend under and binder soil <br />shoulders <br />Surface material 2" Asphalt Depth of4" ¼ Native/existing <br />minus Aggregate soil <br />with binder, or Possible wood <br />existing if chips <br />granular/durable Possible <br />limited gravel <br />Slope for drainage 2% cross slope 2%, fit conditions 2%, fit <br />conditions <br />Maintenance Powersweep Pruning Pruning <br />(Summer) Prun ing Surface maintenance Surface <br />Surface maintenance Sign maintenance maintenance <br />Sign maintenance Sign <br />maintenance <br />Maintenance Cut tracks in some Cut tracks in some None <br />(Winter) segments. segments <br />Plow some segments. <br />Detail reference# PP-I T-1 NT-I <br />Notes: <br />(1) Periodic closures for fish and wildlife. <br />EQUESTRIAN TRAIL <br />( I ) Horses, pedestrians, <br />fal tire bicycles, fat tire <br />strollers <br />(I) Pedestrians, CC skiing <br />and snow shoeing on <br />selected trails <br />Maintenance, security, <br />Emergency Services, <br />Mechanized track cutting <br /><40% <br />+/-10' goal, but +/-2' at <br />steeo slopes <br />NA <br />2'-5 ' to limbs and shrubs. <br />I '-2' to trees <br />12' <br />Native/existing soil <br />Possible gravel <br />Native/existing soil <br />Possible wood chips <br />Possible gravel <br />2%, fit conditions <br />Pruning <br />Surface maintenance <br />Sign maintenance <br />Cut tracks in some <br />segments <br />ET-I <br />(2) Up to 5% is acceptable. Up to 10% over several hundred feet, acceptable on a case-by- <br />case basis, at discretion of Suncadia. <br />Swu;odla Mas ter Planned Resort bhibi1 J -Develo pmeri! um do rd1· <br />5 December 2. 2008 <br />I