Laserfiche WebLink
?KiiiiiasJtIf7.. Capita! lmpfovemeim r3" F r,"ani <br />12. Sanitary Sewer <br />November, 2014 <br />This section includes an inventory of Sanitary Sewer facilities and a detailed description of each <br />facility improvement that is included in the six-year plan. The inventory of facilities in Table 12 <br />below also describes each facility's size in order to determine if it addresses the County's long- <br />term community needs. <br />Via:- € i v Se er mage 43 <br />Table 13 <br />Existing Public Facilities and Services <br />Sanitary Sewer <br />Facili <br />Provider Description <br />Size <br />Ronald treatment <br />Kittitas County Water Single lift station that conveys <br />37 acres <br />facilities <br />District No. 2 wastewater flows from the Water <br />District area to the City of Roslyn <br />sewer system. <br />Snoqualmie Pass <br />Snoqualmie Pass Utility Average daily flow approximately 0. 18 <br />1,361 <br />Utility District <br />District mgd., permitted treatment and <br />acres <br />discharge capacity of 0.868 mgd. and <br />storage of excess flows of about 30 <br />mill. Gal. <br />Vantage <br />Vantage Water District Serves Vantage LAMIRD, wastewater <br />80 <br />wastewater <br />No. 6 collection and treatment system, <br />residences <br />collection and <br />capacity of about 87,000 gpd. Major <br />treatment system <br />upgrades completed in 2013. <br />Via:- € i v Se er mage 43 <br />