My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-2037 Comp Plan Update Enabling Ordinance with Exhibit A
>
Meetings
>
2019
>
06. June
>
2019-06-18 10:00 AM - Commissioners' Agenda
>
2017-2037 Comp Plan Update Enabling Ordinance with Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 1:20:58 PM
Creation date
6/13/2019 1:12:11 PM
Metadata
Fields
Template:
Meeting
Date
6/18/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
h
Item
Request to Approve an Ordinance Adopting the 2017-2037 Comprehensive Plan Periodic Update and Associated Maps
Order
8
Placement
Consent Agenda
Row ID
54424
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ittitas County Capital hiprovement Nogiai-i <br />No=vemher.2 t4 <br />Education — Central Washington Resource Energy <br />Collaborative Center <br />Vicinity Map <br />Central Washington <br />Resource Energy BOWERS RD <br />Caliaborative Center <br />EiNMARp�� <br />BENDER RD _- 1 F <br />... �1 - R4 <br />Project Information and Selection <br />Criteria <br />Location <br />Bowers Field Industrial Park, Ellensburg <br />Links to Other Projects or Facilities <br />N/A <br />Anticipated Savings Due to Project <br />Economic Development Group (EDG) of Kittitas <br />Department Responsible for <br />Operations <br />County will construct a new facility in the designated <br />IPZ Development Zone to provide office space for the <br />Central Washington Resource Energy Collaborative <br />Description <br />Center CWREC . <br />The newly created CWREC requires office space for its <br />program to advance low -carbon energy technology and <br />attract firms that support renewable energy services <br />Justification eed/Demand <br />and professional research. <br />Established LOS: N/A <br />Level of Service (LOS) /Project Tye <br />Project Type: New Facility <br />Comprehensive Plan Citations <br />GPO 5.26 <br />Capital Cost 2015 2016-2020 Total <br />Design and Engineering <br />Construction To be determined To be determined <br />TOTAL To be determined To be determined <br />Funding Sources 2015 2016-2020 Total <br />EBDA and CERB loans To be determined To be determined <br />TOTAL To be determined To be determined <br />Annual Operations and Maintenance <br />Estimated Costs <br />Currently, the County does not track maintenance costs <br />for these improvements. <br />Estimated Revenues <br />None <br />Anticipated Savings Due to Project <br />None <br />Department Responsible for <br />Operations <br />Facilities and Maintenance <br />Education Page 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.