My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-2037 Comp Plan Update Enabling Ordinance with Exhibit A
>
Meetings
>
2019
>
06. June
>
2019-06-18 10:00 AM - Commissioners' Agenda
>
2017-2037 Comp Plan Update Enabling Ordinance with Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 1:20:58 PM
Creation date
6/13/2019 1:12:11 PM
Metadata
Fields
Template:
Meeting
Date
6/18/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
h
Item
Request to Approve an Ordinance Adopting the 2017-2037 Comprehensive Plan Periodic Update and Associated Maps
Order
8
Placement
Consent Agenda
Row ID
54424
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I%5,itti as Cwmty Gapitai Imp roverr. c r;t Prrogram <br />f overnt.nr.20i4 <br />Regional Parks and Trails — Cle Elum Pedestrian Bridge <br />'Vicinity M2aP � .,�•���,� <br />Cle Slum Pedestrian Bridge .a <br />Project Information and Selection <br />Criteria <br />Location <br />South Cle Elum Bridge vicinity, Cle Elum <br />Links to Other Projects or Facilities <br />N/A <br />Construction <br />Build a pedestrian bridge for future connections between <br />Descri tion <br />the Coal Mines Trail and the John Wayne Pioneer Trail. <br />$1,250,000 <br />The South Cle Elum bridge does not provide adequate <br />non -motorized access over the Yakima River for <br />connections between Cle Elum and South Cle Elum and <br />Justification (Need/Demand) <br />the Coal Mines Trail and the John Wayne Pioneer Trail. <br />Level of Service (LOS) /Project <br />Established LOS: N/A <br />Typ e <br />Project Type: New facility <br />Comprehensive Plan Citations <br />GPO 5.26 <br />Capital Cost <br />2015 2016-2020 <br />Total <br />Design and Engineering <br />$150,000 <br />$150,000 <br />Construction <br />$1,100,000 <br />$1,100,000 <br />TOTAL <br />$1,250,000 <br />$1,250,000 <br />Funding Sources 2015 2016-2020 Total <br />Non -motorized Road Fund $1,250,000 $1,250,000 <br />TOTAL $1,250,000 $1,250,000 <br />Annual Operations and Maintenance <br />Estimated Costs <br />Currently, the County does not track maintenance costs <br />for these improvements. <br />Estimated Revenues <br />None <br />Anticipated Savings Due to Project <br />None <br />Department Responsible for <br />Operations <br />Public Works Department <br />Regional Parks ;3nd Trails <br />
The URL can be used to link to this page
Your browser does not support the video tag.