My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-2037 Comp Plan Update Enabling Ordinance with Exhibit A
>
Meetings
>
2019
>
06. June
>
2019-06-18 10:00 AM - Commissioners' Agenda
>
2017-2037 Comp Plan Update Enabling Ordinance with Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 1:20:58 PM
Creation date
6/13/2019 1:12:11 PM
Metadata
Fields
Template:
Meeting
Date
6/18/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
h
Item
Request to Approve an Ordinance Adopting the 2017-2037 Comprehensive Plan Periodic Update and Associated Maps
Order
8
Placement
Consent Agenda
Row ID
54424
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Filed for Record 04/16/2009 04:48:53 PM - Kittitas County, WA Auditor - 200904160090 Page 45 of 118 <br />(c) A preliminary plat application may be approved by the BOCC without <br />evidence of an adequate water supply to meet the needs of such proposed subdivision, provided <br />that such evidence must be provided to the BOCC prior to final plat approval. Appropriate <br />provisions shall have been made for the public health, safety and general welfare, including with <br />respect to proposed sewage disposal and water supply systems, including potable water supplies, <br />in accordance with RCW 58.17.110 with respect to any final plat that is consistent with <br />Applicable Law, this Agreement and the MountainStar MPR Conditions_ <br />5.3 Infrastructure, Surety Bonding or Other Assurances. Infrastructure identified <br />by Trendwest in an approved Site Development Plan must be provided and available for use <br />before the issuance of the first certificate of occupancy for Master Planned Resort <br />Accommodation Units included within such plan. For purposes of final plat approval or issuance <br />of building permits, infrastructure may be guaranteed through surety bonding or other financial <br />assurance device (e.g. letter of credit) acceptable to the County. The estimated costs of <br />providing all such guaranteed Infrastructure shall be reviewed and approved by the County <br />Public Works Director or designee. Surety bonding or other acceptable financial device (e.g. <br />letter of credit) provided to the County shall be in an amount equal to at least one hundred ten <br />percent (110%) percent of such estimated costs as determined by Trendwest's architects and <br />engineers. The County shall have the right, at its expense, to retain its own architects and <br />engineers to verify Trendwest's estimated costs hereunder. <br />5.4 Permit Issuance. Building permits and other Subsequent Actions required for <br />the development of MountainStar shall be issued only after the County building official confirms <br />with the Planning Director that the work to be performed under the building permit or <br />Subsequent Action substantially conforms with an approved Site Development Plan. <br />Suncadia Mastcr Pianned Resort Development Agreement (Amended and Restated 12-02-2008) Page 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.