Laserfiche WebLink
EXHIBIT "A'' <br />SCOPE OF WORK <br />ln addition to providing all material and labor, the Contractor shall perform the following <br />Remove and dispose of the existing asphalVconcrete' <br />Excavate to a total depth of 9 inches and dispose of the excavated material <br />Compact the exposed subgrade to the extent feasible. <br />Place fabric across the exposed subgrade. (Mirafi 500X or approved equal) <br />Place 7" crushed rock Base Course and 2" crushed rock top course. <br />Repave the area with 3" of Class "8" Mix in one List. (APWA spec) <br />Seal the paved area with emulsion at the rate of .1 gallon/SY. <br />Allwork must be done between June 17, and June 27, 2019. <br />The completed repairs need to have slope away from buildings to existing drainage <br />The areas colored in blue and ramp to gazebo (aqua blue) are included in repair. <br />1) <br />2) <br />3) <br />4) <br />5) <br />6) <br />7',) <br />8) <br />1,,1Êès,Jrå drslancÈ <br />Professional Services Agreement (rev. 09/2412018) <br />Page 13 of 17