My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQKachessLakeRoadCulvertReplacement
>
Meetings
>
2019
>
06. June
>
2019-06-04 10:00 AM - Commissioners' Agenda
>
RFQKachessLakeRoadCulvertReplacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 1:16:47 PM
Creation date
5/30/2019 1:16:40 PM
Metadata
Fields
Template:
Meeting
Date
6/4/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
o
Item
Request to Approve a Notice of Request for Qualifications Supporting Design and Environmental Permitting for the Replacement of a Road Culvert at Kachess Lake Road (MP 2.30 - MP 2.70) Kittitas County, Washington
Order
15
Placement
Consent Agenda
Row ID
54071
Type
Hearing notice
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br />Public Notice <br />Kittitas County, Ellensburg WA <br />REQUEST FOR STATEMENT OF QUALIFICATIONS SUPPORTING DESIGN AND ENVIRONMENTAL <br />PERMITTING FOR REPLACING THE ROAD CULVERT AT KACHESS LAKE ROAD (MP 2.30 - MP 2.70) <br />KITTITAS COUNTY, WASHINGTON <br />All submittals received after 10:00am local time on June 27, 2019 will be discarded <br />PURPOSE: <br />The existing road culvert at Kachess Lake Road (approximate MP 2.5) is failing and requires replacement. Design services <br />are needed with likely fish passage implications. Environmental support services are needed supporting the acquisition of <br />all Federal and State permits. Bid ready plans, specifications and bid support are required supporting the project. <br />SCOPE OF PROJECT: <br />Hydraulic analysis supporting design criteria is necessary. It is likely that interaction with the Washington State Department <br />of Fish and Wildlife and multiple federal permitting agency personnel will be required. Once the basis of design is <br />documented and agreed upon, the consultant will secure all necessary project environmental permits, prepare bid ready <br />documents (plans, specifications and engineering discipline reports) and support the County through construction bidding. <br />FOR SUBMITTAL: <br />If you wish to be considered for work under this SOQ, you must be a registered consultant on the Municipal Research and <br />Service Center (MRSC) of Washington — Shared Small Works and Consultant Roster (www.mrscroster.org). <br />If interested in providing engineering and environmental permitting support services to the County, submit a sealed <br />envelope to Mark R. Cook, Kittitas County Public Works Director, at 411 N. Ruby St. Suite 1, Ellensburg WA 98926, by <br />10am local time on June 27, 2019. Submittals shall include a one page cover letter with the firm name as listed on the <br />MRSC web site, and contact information. Submittals shall also include four copies of your Statement of Qualifications <br />describing the firm's or team's ability to professionally provide the aforementioned services. Address submittals: Kachess <br />Lake Road Culvert Replacement. <br />For your records, the County will provide a confirmation email to the contacts provided in the submittal confirming receipt <br />of your interest in the proposal. Submittals received after 10:00am local time on June 27, 2019 will be disregarded. Kittitas <br />County encourages disadvantaged, minority and women owned consultant forms to respond. <br />The County reserves the right to reject any and all submittals. <br />SELECTION PROCESS AND PROPOSED SCHEDULE: <br />Kittitas County selection will be based on review of submittals in the following manner: <br />1. The firm's or team's qualifications, experience and ability to perform the work (30 points); <br />2. Demonstrated experience with similar projects (30 points); <br />3. Demonstrated experience obtaining state and federal environmental permits (30 points); <br />4. Past experience working in Kittitas County (20 points); <br />5. Demonstrated ability to keep projects on time and within budget (20 points); <br />6. Demonstrated ability to communicate and work effectively with the public, staff, policy and review bodies and <br />regulatory agencies (20 points) <br />Anticipated Dates and Tasks: <br />June 27, 2019 - Deadline for SOQ submittals <br />July 12, 2019 - Selection of Firms to Interview <br />July 22, 2019 - Interviews and Reference Checks <br />August 5, 2019 - Selection of firms and prepare contracts <br />file:///C:fLJsers/candic.leader/Downloads/newspaper-text%20(24).html 5/29/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.