Laserfiche WebLink
Priority 8:Huntzinger Rd Safety Improvements <br />N <br />} <br />IIII1y � 1 <br />im,inp�• 113 <br />.. Ponen <br />— - u�rnnuna <br />ortnu <br />�I --norm., <br />R <br />P <br />Phase 1 is between MP 2.70 to MP 4.88 has several horizontal curves, steep embankments and <br />no shoulder in places with minimal countermeasures in place. <br />0 ESTIMATED COST $727,259 <br />Phase 2 is between MP 5.14 to MP 6.99 where there is steep embankments, no shoulder in <br />areas and need of guardrail, signs and/or delineation. <br />ESTIMATED COST $314,831 <br />Phase 3 is between MP 6.99 to MP 10.74 with sharp horizontal curves, vertical curves, steep <br />embankments, very little to no shoulder and inadequate clear zone. <br />ESTIMATED COST $535,340 <br />