Laserfiche WebLink
Priority 4: Bridge Rail Improvements <br />Code 1 <br />a all l <br />W". Rft FW IN&L Dhtdd. <br />0-0% una.ln.r. x <br />� ,■■I —ateur • <br />--e¢ewnw • <br />sera —mm•+ c <br />j �mm+umwn D —. <br />L —War e i <br />Amor iw <br />Phase 1 is within County Maintenance Districts A -D with 2 bridges or structures <br />ESTIMATED COST $416,151 <br />• Phase 2 is within County Maintenance <br />District E with 1 bridges or structures <br />o ESTIMATED COST $1,001,075 <br />• Phase 3 is within County Maintenance <br />District F -L with 17 bridges or <br />structures <br />ESTIMATED COST $455,760 <br />These bridges or structures will need <br />upgraded rail and approaches to be <br />brought up to standards to prevent <br />serious injury or fatality accidents if <br />collision should occur. <br />19 <br />