Laserfiche WebLink
Priority 4: Bridge Flail Improvements <br />Code 1 <br />Phase 1 is within County Maintenance Districts A -D with 2 bridges or structures <br />o ESTIMATED COST $416,151 <br />Phase 2 is within County Maintenance <br />District E with 1 bridges or structures <br />o ESTIMATED COST $1,001,075 <br />Phase 3 is within County Maintenance <br />District F -L with 17 bridges or <br />structures <br />o ESTIMATED COST $455,760 <br />These bridges or structures will need <br />upgraded rail and approaches to be <br />brought up to standards to prevent <br />serious injury or fatality accidents if <br />collision should occur. <br />19 <br />