Laserfiche WebLink
Fee Worksheet <br />ALSCHours Fee Subtotal Fee <br />KiWtas County <br />Bloom Pavilion Heating, Ventilation & Footing <br />July 16, 2018 <br />Proposed Fee Summary <br />Design and Construction Documents 76.00 $11,490 <br />Bid Period 40.00 $4,920 <br />Construction ( assume 4 weeks) 89.00 $10,320 <br />(subtotal) $26,730 $26,730 <br />TOTAL ALSC HOURS 205.00 <br />ALSC FEE (w/o reimbursables) $26,730 <br />Consultant Fees ALSC Overhead <br />Mechanical & Electrical (MW) $15,750 1.1 $17,325 <br />Landscape $0 1.1 $0 <br />Civil (DCI) $6,400 1.1 $7,040 <br />Structural (DCI) $2,500 1.1 $2,750 <br />1.1 $0 <br />TOT AL FEE (w/o reimbursables) $53,845 <br />Reimbursable Cost Allowance <br />Travel, Food & Lodging $1,035 1.1 $1,139 <br />Printing $1,000 1.1 $1,100 <br />DCI (Civil) $250 1.1 $275 <br />TOTAL REIMBURSABLE ALLOWANCE $2,514 <br />TOTAL FEE INCLUDING REIMBURSABLES $56,359 <br />ALSC Architects Summary 7/16/2018