Laserfiche WebLink
EXHIBIT "B" <br />COMPENSATION <br />As full compensation for satisfactory performance of the work, the County shall pay <br />Contractor compensation on a time a materials base: <br />TASK 1: LAGOON PUMP OUT AND APPLICATION <br />Description <br />Equipment Operator <br />Equipment Operator, Overtime <br />Field Technician <br />Field Technician Overtime <br />2500psi Hot Water Pressure Washer <br />Confined Space Entry Gear (Retrieval & Rescue Equip) <br />Level C w/CPF3 or Saranex Suit/Changeout <br />Modified Level D (Tyvec, Gloves and Boots) <br />PickupN an/Car/Crew Cab <br />Stake Body/Utility Truck <br />Tractor w/Vacuum Trailer <br />Misc. Handtools <br />Misc. Materials <br />Per Diem I Subsistence <br />TASK 2: TANK RENTAL AND EQUIPMENT <br />Amount Description Qty/UOM <br />1 DEMOBILIZATION OF TANKS 1 each <br />4 FRAC TANK, 21000 GAL 28 day <br />1 MOBILIZATION OF TANKS 1 each <br />1 PUMPS, PIPING AND MISC. 1 month <br />SUPPLIES <br />Payment terms shall be thirty {30} day from receipt of an undisputed invoice. <br />Professional Services Agreement (rev. 11/08/2018) <br />Page 16 of 19 <br />UOM Price <br />hour $78.63 <br />hour $117.95 <br />hour $53.00 <br />hour $79.50 <br />day $250.00 <br />day $320.00 <br />each $65.00 <br />each $25.00 <br />hour $22.00 <br />hour $32.00 <br />hour $95.00 <br />day $75 .00 <br />each $200.00 <br />day $211.00 <br />Days Price Total <br />n/a $3,519.00 $3,519.00 <br />n/a $30.59 $3,426.08 <br />n/a $3,519.00 $3,519.00 <br />n/a $12,532 .08 $12,532.08 <br />Total $22,996.16