Laserfiche WebLink
How we will do this: <br />County Implementation Responsibilities KITTCOM Implementation Responsibilities <br />Phase 1 Develop Meet Point Agreement with <br />Meet-Z KVFR, KITTCOM, and County. <br />Lease, at KITTCOM expense,fiber optic <br />connectivity between Court House and <br />Q1-Q2 KVFR. <br />2019 <br />Install and maintain, as an owner or <br />lessee, fiber optic cable from inside <br />KVFR Station 29 to KVFR vault near Zayo <br />vault; coil and stow for others. <br />Splice KITTCOM newly provided Install, splice, and maintain, as an <br />coiled/stowed" fiber optic tail in KVFR owner or lessee, fiber optic patch panel <br />vault to Zayo Fibers.within meet point at KVFR to allow a <br />meet of 12 strands. <br />Provide Rack Space at Courthouse for <br />Mux/DeMux/Transport equipment. Provide,and maintain, Mux/DeMux <br />Provide limited AC power if needed. equipment for multiplexed fiber <br />connectivity between Courthouse and <br />KVFR Station 29. <br />Provide for County use (and maintain), <br />necessary SFP lasers to light fiber, <br />between Court House and KVFR for <br />1Gbps. <br />Provide Rack Space/ Equipment Space, Phase Provide,and maintain, Mux/DeMux <br />at Courthouse NOC and at upper County 2 equipment for multiplexed fiber <br />POP. Provide limited AC power if Upper connectivity between Courthouse and <br />needed. County upper county POP. <br />Mux/ <br />DeMux Provide for County use (and maintain) <br />necessary SFP lasers to light fiber <br />between Court House and KVFR for <br />1Gbps.