My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Staff Report for 2-19-19 Fee Hearing
>
Meetings
>
2019
>
02. February
>
2019-02-19 2:00 PM - 2:00pm Public Hearing
>
Staff Report for 2-19-19 Fee Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 1:49:05 PM
Creation date
2/14/2019 1:48:56 PM
Metadata
Fields
Template:
Meeting
Date
2/19/2019
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the 2019 Community Development Services Fee Schedule.
Order
1
Placement
2:00pm Public Hearing
Row ID
51523
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />COMMUNITY PLANNING BUILDING INSPECTION PLAN REVIEW ADMINISTRATION PERMIT SERVICES CODE ENFORCEMENT <br />KITTITAS COUNTY COMMUNITY DEVELOPMENT SERVICES <br />411 N. Ruby St., Suite 2, Ellensburg, WA 98926 <br />CDS@CO.KITTITAS.WA.US <br />Office (509) 962-7506 <br />Fax (509) 962-7682 <br /> <br />“Building Partnerships – Building Communities” <br /> <br /> <br />February 19, 2019 <br /> <br />To: Board of County Commissioners <br /> <br />From: Dan Carlson, AICP <br /> Community Development Services Director <br /> <br />RE: Proposed 2019 Community Development Services Fee Schedule Staff Report <br /> <br />Introduction <br />Staff has updated the Community Development Services (CDS) fee model with current department staff, <br />expenditures, and valuation data to determine the proposed CDS fees for 2019. These fees are divided <br />into three categories – Building Permit Fees for New Construction (Exhibit A & B), Fees for Building <br />Fixtures (Exhibit C), and Fees for Planning Services (Exhibit D). <br /> <br />Building Permit Fees for New Construction <br />Building permit fees for new construction would continue to be determined based upon a multiplier <br />(Exhibit A), a model enabling the user to determine how much service will cost for plans examination and <br />building inspection given total construction valuation for the project. This multiplier is based upon the <br />International Code Council (ICC) suggested model, and upon the most current published Building <br />Valuation Data table of the International Code Council Building Safety Journal (Exhibit B). This is a <br />national “average” construction cost per square foot for new construction. This fee model simplifies the <br />permit cost process and includes foundation work, structural and non-structural components, plumbing, <br />mechanical and interior finish. The ICC model allows CDS to adjust permit fees based on annual <br />construction activity and the desired level of service determined by the Board of County Commissione rs. <br /> <br />The multiplier works as follows: <br /> <br /> Projected gross construction valuation for the coming year is divided into the projected budget for <br />the coming year to create a multiplier. <br /> <br /> The multiplier is then used against the square foot cost of the construction project estimated by <br />using the most current August issue of the Building Safety Journal Building Valuation Data sheet <br />published by the International Code Council (Exhibit B). <br /> <br /> This produces a permit fee adequate to process the building permit. This cost includes all <br />plumbing and mechanical associated with new construction. <br /> <br /> A five percent (5%) technology and equipment surcharge is added to permit fees to cover the <br />cost of repair and replacement of vehicles and equipment needed to service the building permits. <br /> <br />The current multiplier for new construction is .0085. Staff used a three-year average for building <br />valuation to determine the gross projected building valuation. Dividing this valuation into the 201 9 <br />building budget produces a multiplier of .0085, which matches the current multiplier. Therefore, no <br />change to the multiplier is proposed. (Exhibit A)
The URL can be used to link to this page
Your browser does not support the video tag.