Laserfiche WebLink
2019 Maintenance Rock Materials <br />Bid Opening January 29, 2019, at 2 :00 p.m . <br />SCHEDULE 'B' <br />Vendor to Provide Labor and Equipment to Load Materials <br />ESTIMATED <br />ITEM QUANTITY <br />NO. (In TONS) Location ITEM DESCRIPTION Ellensburg Cement Products BIDDER <br />PRI CE PER <br />PRICE PER TON TOTAL PRICE TON TOTAL PRICE <br />1 6 ,400 Ellensburg BST Crushed Surfacing 1/2 to No. 4 $10 .50 $67 ,200 .00 $0.00 <br />2 4 ,700 East Kittitas BST Crushed Surfacing 1/2 to No . 4 $10 .50 $49 ,350 .00 $0 .00 - <br />3 3 ,400 Cle Elum BST Crushed Surfacing 1/2 to No . 4 $10.50 $35 ,700 .00 $0.00 ---· <br />4 1 ,700 Easton BST Crushed Surfacing 1/2 to No . 4 $16 .50 $28 ,050 .00 $0 .00 <br />------1--·- <br />5 2,400 Ellensburg BST Crushed Surfacing 3/8 to No . 10 $13 .65 $32 ,760.00 <br />6 1,600 Cle Elum BST Crushed Surfacing 3/8 to No . 10 $13 .65 $21 ,840 .00 $0 .00 <br />7 4 ,000 Ellensbu rg Maintenance Sand $8.60 $34 ,400 .00 $0.00 ---· <br />8 4 ,000 Cle Elum Maintenance Sand $8 .60 $34 ,400 .00 $0 .00 <br />1 1/4 " Crushed Surfacing Base <br />9 1,000 Ellensburg Course $8 .00 $8 ,000 .00 $0.00 <br />1 1/4" Crushed Surfacing Base <br />10 1,000 Cle Elum Course $8 .00 $8,000 .00 $0 .00 <br />11 2 ,000 Ellensburg 5/8 " Crushed Surfacing Top Course $8.10 $16 ,200 .00 $0 .00 <br />12 2 ,000 Cle Elum 5/8 " Crushed Surfacing Top Course $8 .10 $16 ,200 .00 $0 .00 <br />13 1,000 Ellensburg 2 1/2" Ballast $7 .90 $7 ,900 .00 $0 .00 <br />14 1 ,000 Cle Elum 2 1 /2 " Ballast $7.90 $7 ,900 .00 $0 .00 <br />Sub-total before Tax -$367 ,900 .00 $0 .00 <br />SALES TAX-8.00% $29,432 .00 8.00% $0.00 <br />Total Schedule "B" -$397,332.00 $0.00 <br />SCHEDULE "B"