Laserfiche WebLink
2019 Maintenance Rock Materials <br />Bid Opening January 29, 2019, at 2:00 p.m. <br />SCHEDULE 'C' <br />Vendor to Provide Labor and Equipment to Load Materials <br />ESTIMATED <br />ELLENSBURG CEMENT <br />BIDDER <br />ITEM <br />NO. <br />QUANTITY <br />(In TONS) <br />ITEM DESCRIPTION <br />PRICE PER TON TOTAL PRICE <br />PRICE PER TOTAL PRICE <br />TON <br />Per Ton <br />15 <br />(Ellensburg) <br />Select Borrow <br />$4.00 $4.00 <br />$0.00 <br />Per Ton <br />16 <br />(Cie Elum) <br />Select Borrow <br />$6.00 $6.00 <br />$0.00 <br />Per Ton <br />17 <br />(Ellensburg) <br />Light Loose Riprap <br />$24.00 $24.00 <br />$0.00 <br />Per Ton <br />18 <br />(Cie Elum) <br />Light Loose Riprap <br />$24.00 $24.00 <br />$0.00 <br />Per Ton <br />19 <br />(Ellensburg) <br />Quarry Spalls <br />$8.25 $8.25 <br />$0.00 <br />Per Ton <br />20 <br />(Cie Elum) <br />Quarry Spalls <br />SALES TAX - <br />$8.25 $8.25 <br />8.00% <br />$0.00 <br />8.00% $0.00 <br />