Laserfiche WebLink
2019 Maintenance Rock Materials <br />Bid Opening January 29, 2019 at 2:00 p.m. <br />SCHEDULEW <br />County to Provide Labor and Equipment to Load Materials <br />ITEM <br />NO. <br />ESTIMATED <br />QUANTITY <br />(in TONS) <br />Location <br />ITEM DESCRIPTION <br />Ellensburg Cement <br />PRICE PER TON <br />Products <br />TOTAL PRICE <br />BIDDER <br />PRICE PER <br />TON <br />TOTAL PRICE <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />6,400 <br />4,700 <br />3,400 <br />1,700 <br />2,400 <br />1,600 <br />4,000 <br />4,000 <br />1,000 <br />1,000 <br />2,000 <br />2,000 <br />1,000 <br />1,000 <br />Ellensburg <br />BST Crushed Surfacing 1/2 to No. 4 <br />BST Crushed Surfacingi 1/2 to No. -4 <br />BST Crushed Surfacing 1/2 to No. 4 <br />BST Crushed Surfacing 1/2 to No. 4 <br />BST Crushed Surfacing 3/8 to No. 10 <br />BST Crushed Surfacing 3/8 to No. 10 <br />Maintenance Sand <br />Maintenance Sand <br />1 1/4" Crushed Surfacing Base <br />Course <br />1/4" Crushed Surfacing Base Cours <br />$10.25 <br />$10.25 <br />$10.25 <br />$16.25 <br />$13.40 <br />$13.40 <br />$8.35 <br />$65,600.00 <br />$48,175.00 <br />$34,850.00 <br />$27,625.00 <br />$32,160.00 <br />$21,440.00 <br />$33,400.00 <br />$33,400.00 <br />$71750.00 <br />$7,750.00 <br />$15,700.00 <br />$0.00 <br />-$0-.00-- <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$_0_.0.0 <br />$0.00 <br />East Kittitas <br />Cie Elum <br />Easton <br />Ellensburg <br />Cie Elum <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />Ellensburg <br />Cie Elum <br />$8.35 <br />$7.75 <br />$7.75 <br />$7.85 <br />$7.85 <br />Ellensburg <br />Cie Elum <br />Ellensburg <br />$0.00 <br />$0.00 <br />5/8" Crushed Surfacing Top Course <br />5/8" Crushed Surfacing Top Course <br />2 1/2" Ballast <br />2 1/2" Ballast <br />Sub -total before Tax - <br />SALES TAX - <br />Cie Elum <br />Ellensburg <br />$15,700.00 <br />$7,650.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$7.65 <br />$7.65 <br />8.00% <br />Cie Elum <br />$7,650.00 <br />$358,850.00 <br />$28,708.00 <br />8.00% <br />Total Schedule "A" - <br />$387,558.00 <br />$0.00 <br />6YH9-01111S:w-1Y <br />