Laserfiche WebLink
<br />122 <br />Irene Rinehart Riverfront Park takeout ramp, Rinehart/Umptanum <br />Bridge launch ramp rebuild, Teanaway River Bridge SR-10 off-road <br />launch, parking, and trails, and Hanson Ponds/Whispering Pines <br />Drive/Levy footbridge rebuild. <br /> <br />Committee members gave higher composite scores for safety, on- <br />water, and shoreline opportunities, however, to the acquisition of <br />the Old Church Camp, Swauk Creek Access, and Bullfrog Road <br />Bridge sites – and even higher composite scores to the development <br />of these sites as well as Kittitas County’s Thrall Road/Wilson Creek <br />site. <br /> <br />While high priority scores are significant in determining where to <br />focus public access resources the scores per se should not <br />determine where implementation actions take place. In general, <br />public access resources should be utilized in an opportunistic <br />manner shifting focus, where necessary and appropriate, to <br />implement site enhancements, acquisitions, and developments <br />when partnerships, funding sources, and other conditions emerge <br />and/or allow. <br /> <br />Project development cost estimates <br /> <br />Development costs were estimated for proposed enhancements to <br />existing access sites and for the development, but not the <br />acquisition costs, for proposed new acquisition and development <br />sites. <br /> <br />All estimates are in 2018 dollars and do not include geotechnical <br />costs, boulder removal, irrigation, utilities, sales tax, permitting <br />costs, surveys, design fees, hazardous materials removal, or <br />environmental mitigations. <br /> <br />Sponsor Enhancements to existing access sites $2,143,000 <br />WDFW King Horn Slough-Hundley Road trails, <br />picnic <br />$235,500 <br />P&RC Bullfrog Road South toilet $290,500 <br />Cle Elum Hanson Ponds/Whispering Pines <br />footbridge <br />$173,600 <br />BPA Lambert Road Access trails $35,000 <br />County Teanaway River Bridge access, launch, <br />trails <br />$571,200 <br />BPA Clark Flat Acclimation Ponds trails $45,500 <br />WDFW Thorp/Green Bridge trails, picnic, toilet $384,200 <br />County Ellensburg KOA shoreline trails $35,800 <br />County Thorp Highway South Bridge trails $42,700 <br />Ellensburg Rinehart/Umptanum Bridge launch <br />rebuild <br />$329,000 <br />Sponsor New access sites without bridges $7,646,250 <br />BPA Easton Acclimation Ponds* $195,325 <br />Suncadia Bull Frog Road Bridge North $300,000 <br />Suncadia Bull Frog Road Bridge South* $630,650 <br />County Old Church Camp* $898,500 <br />County Swauk Creek Access* $1,327,000 <br />Ellensburg City Wells $573,000 <br />County Gladmar Road Conservancy* $572,000 <br />Ellensburg Upper Irene Rinehart Riverfront Park $435,650 <br />County Thrall Road/Wilson Creek Access* $1,792,000 <br />WDOT Mile Post 20/19* $163,125 <br />BLM Big Pines Campground Suspension <br />Bridge* <br />$759,000 <br />Sponsor Suspension bridges $6,396,000 <br />BPA Easton Acclimation Ponds $780,000 <br />DNR Old Church Camp $1,794,000 <br />P&RC Swauk Creek Access $1,872,000 <br />BLM Big Pines Campground $1,950,000 <br /> All total $16,185,250 <br />* Does not include trails and other site structures or features beyond <br />the main area of site development. <br /> <br />Development costs by sponsor, meaning landowner in most cases, <br />are lowest for Cle Elum at $173,600, consisting primarily of <br />redeveloping the footbridge in Hanson Ponds to Whispering Pines <br />Drive levy, and highest for Kittitas County at $5,239,200 for <br />improvements to Teanaway River Bridge on SR-10, Ellensburg KOA <br />shoreline trails to the landfill site, Thorp Highway South Bridge <br />trails, Gladmar Road Conservancy footbridge access, and the new <br />