<br />122
<br />Irene Rinehart Riverfront Park takeout ramp, Rinehart/Umptanum
<br />Bridge launch ramp rebuild, Teanaway River Bridge SR-10 off-road
<br />launch, parking, and trails, and Hanson Ponds/Whispering Pines
<br />Drive/Levy footbridge rebuild.
<br />
<br />Committee members gave higher composite scores for safety, on-
<br />water, and shoreline opportunities, however, to the acquisition of
<br />the Old Church Camp, Swauk Creek Access, and Bullfrog Road
<br />Bridge sites – and even higher composite scores to the development
<br />of these sites as well as Kittitas County’s Thrall Road/Wilson Creek
<br />site.
<br />
<br />While high priority scores are significant in determining where to
<br />focus public access resources the scores per se should not
<br />determine where implementation actions take place. In general,
<br />public access resources should be utilized in an opportunistic
<br />manner shifting focus, where necessary and appropriate, to
<br />implement site enhancements, acquisitions, and developments
<br />when partnerships, funding sources, and other conditions emerge
<br />and/or allow.
<br />
<br />Project development cost estimates
<br />
<br />Development costs were estimated for proposed enhancements to
<br />existing access sites and for the development, but not the
<br />acquisition costs, for proposed new acquisition and development
<br />sites.
<br />
<br />All estimates are in 2018 dollars and do not include geotechnical
<br />costs, boulder removal, irrigation, utilities, sales tax, permitting
<br />costs, surveys, design fees, hazardous materials removal, or
<br />environmental mitigations.
<br />
<br />Sponsor Enhancements to existing access sites $2,143,000
<br />WDFW King Horn Slough-Hundley Road trails,
<br />picnic
<br />$235,500
<br />P&RC Bullfrog Road South toilet $290,500
<br />Cle Elum Hanson Ponds/Whispering Pines
<br />footbridge
<br />$173,600
<br />BPA Lambert Road Access trails $35,000
<br />County Teanaway River Bridge access, launch,
<br />trails
<br />$571,200
<br />BPA Clark Flat Acclimation Ponds trails $45,500
<br />WDFW Thorp/Green Bridge trails, picnic, toilet $384,200
<br />County Ellensburg KOA shoreline trails $35,800
<br />County Thorp Highway South Bridge trails $42,700
<br />Ellensburg Rinehart/Umptanum Bridge launch
<br />rebuild
<br />$329,000
<br />Sponsor New access sites without bridges $7,646,250
<br />BPA Easton Acclimation Ponds* $195,325
<br />Suncadia Bull Frog Road Bridge North $300,000
<br />Suncadia Bull Frog Road Bridge South* $630,650
<br />County Old Church Camp* $898,500
<br />County Swauk Creek Access* $1,327,000
<br />Ellensburg City Wells $573,000
<br />County Gladmar Road Conservancy* $572,000
<br />Ellensburg Upper Irene Rinehart Riverfront Park $435,650
<br />County Thrall Road/Wilson Creek Access* $1,792,000
<br />WDOT Mile Post 20/19* $163,125
<br />BLM Big Pines Campground Suspension
<br />Bridge*
<br />$759,000
<br />Sponsor Suspension bridges $6,396,000
<br />BPA Easton Acclimation Ponds $780,000
<br />DNR Old Church Camp $1,794,000
<br />P&RC Swauk Creek Access $1,872,000
<br />BLM Big Pines Campground $1,950,000
<br /> All total $16,185,250
<br />* Does not include trails and other site structures or features beyond
<br />the main area of site development.
<br />
<br />Development costs by sponsor, meaning landowner in most cases,
<br />are lowest for Cle Elum at $173,600, consisting primarily of
<br />redeveloping the footbridge in Hanson Ponds to Whispering Pines
<br />Drive levy, and highest for Kittitas County at $5,239,200 for
<br />improvements to Teanaway River Bridge on SR-10, Ellensburg KOA
<br />shoreline trails to the landfill site, Thorp Highway South Bridge
<br />trails, Gladmar Road Conservancy footbridge access, and the new
<br />
|