My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2019-003 Vantage to Pomona CUP
>
Meetings
>
2019
>
01. January
>
2019-01-02 10:00 AM - Commissioners' Agenda
>
Res-2019-003 Vantage to Pomona CUP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2019 10:50:38 AM
Creation date
1/4/2019 10:50:22 AM
Metadata
Fields
Template:
Meeting
Date
1/2/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
f
Item
Request to Approve a Resolution Approving the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
6
Placement
Consent Agenda
Row ID
50242
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ' <br />ill. RECOMMENDED DECISION <br />Based on the above Findings of Fact and Conclusions of Law, Application CU-18-00001 is hereby <br />recommended to be APPROVED subject to the following Recommended Conditions of Approval. <br />IV. RECOMMENDED CONDITIONS OF APPROVAL <br />All Conditions of Approval shall apply to the Applicant, and the Applicant's heirs, successors in <br />interest and assigns. <br />1. Th e pr oj ect sh al I proceed in substantial confor mance wi th the p lans and application mater iaJs <br />on fi le with CDS dated July 17, 201'8 a1~d s ubsequent inform ation in cluded in the tomplete fil e <br />index except as amended by the conditions herein . <br />2. State and Federal <br />1. Applicant must meet all applicable state and federal regulations. <br />2. The Applicant shall work with Washington State Fish and Wildlife to detennine ifHPA <br />permitting is required and obtain any necessary pennits prior to any work involving stream <br />crossings. <br />3. Building <br />I. All new construction must meet the International Building Code requirements. <br />4. Roads and Transportation <br />1. The subject project crosses Interstate 82 (1-82), a fully-controlled limited access facility <br />with a posted speed limit of 70 miles per hour. Direct access to 1-82 is prohibited. Access <br />to the proposed project shall be via private property adjacent State Route 821 (SR 821). <br />The Applicant is required to contact Mark Kaiser at the WSDOT -South Central Region <br />Office at (S09) S77-1668 to ensure all access connection permits are up to date. <br />2. Any work to be performed in WSDOT rights-of-way must be coordinated with the South <br />Central Regional Utilities office prior to beginning any work. The South Central Region <br />Utilities Engineer is Jamil Anabtawi. He can be reached at (S09) S77-1785. <br />3. Any work moving more than 100 cubic yards of material will require grading pennits <br />through Kittitas County Public Works. <br />5. Fire & Life Safety <br />1. All development, design and construction shall comply with the International Fire Code <br />requirements. <br />6. EIS Adoption <br />1. All development shall conform to the mitigation measures outlined in the Vantage to <br />Pomona Heights Final Environmental Impact Statement published in October, 2016. <br />7. Land Control <br />1. The Applicant shall acquire pennission in writing from all private property owners whose <br />property will be traversed and submit documentation of permission to Kittitas County CDS <br />prior to construction. <br />CU-18-00001 <br />Vantage to Pamona Heights <br />Page 7 of8
The URL can be used to link to this page
Your browser does not support the video tag.