My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2019-004 Talisman Townhomes
>
Meetings
>
2019
>
01. January
>
2019-01-02 10:00 AM - Commissioners' Agenda
>
Res-2019-004 Talisman Townhomes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2019 10:50:31 AM
Creation date
1/4/2019 10:50:22 AM
Metadata
Fields
Template:
Meeting
Date
1/2/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
g
Item
Request to Approve a Resolution Approving the Talisman Townhomes Preliminary Plat (LP-18-00003)
Order
7
Placement
Consent Agenda
Row ID
50242
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 . The Final Plat shall meet all requirements of applicable law as defined in the Development <br />Agreement. <br />7. The Final Plat shall contain the name of the Engineer/Surveyor responsible for preparing the <br />documents on all sheets. <br />8. The Final Plat shall contain the page number and total number of pages on all sheets. <br />9 . All development, design and construction shall comply with all applicable laws as defined in the <br />Development Agreement. <br />10. Lot and road dimensions are to be shown on the face of the plat. <br />11. The applicant shall contact the Kittitas County Rural Addressing Coordinator at (509) 962-7523 to <br />obtain addresses prior to obtaining a building pennit. A parcel cannot receive a building pennit or <br />utilities until such parcel is identified with a 911 address . <br />12. Civil Plans will be reviewed and approved as submitted prior to final plat approval in accordance with <br />the Development Agreement. <br />13. Roadway design shall include plan and profile drawings meeting design parameters detailed in "Table <br />1 -MountainStar Roadway Design Criteria"; Exhibit J -Development Standards and Design <br />Guidelines for MountainStar Master Planned Resort December 2, 2008. Specifically, Loop road <br />requirements. <br />14. Required Infrastructure and Utilities, as defined in the Development Agreement, shall be installed and <br />completed or bonded or other financial guaranties or accommodations made for their completion prior <br />to final plat approval of each subphase. <br />15. Timing of Improvements: Per the Suncadia 2009 Development Agreement section 5.3 Infrastructure, <br />Surety Bonding or Other Assurances. Infrastructure identified by Trendwest in an approved Site <br />Development Plan must be provided and available for use before the issuance of the first certificate of <br />occupancy for Master Planned Resort Accommodation Units included with such plan. For purposes <br />of final plat approval or issuance of building permits, infrastructure may be guaranteed through surety <br />bonding or other financial assurance device acceptable to the County. The estimated costs of <br />providing all such guaranteed Infrastructure shall be reviewed and approved by the County Public <br />Works Director or designee. Surety bonding or other financial device provided to the County shall be <br />in an amount equal to at least 110% of such estimated costs as determined by Trend west's architects <br />and engineers. <br />16. Water system design requirements shall be consistent with requirements presented in Exhibit J- <br />Development Standards and Design Guidelines for MountainStar Master Planned Resort December 2, <br />2008; Section 6. An accounting of equivalent residential unit allocation serving Talisman shall be <br />provided with final water system plan submittal. <br />17. System design requirements shall be consistent with requirements presented in Exhibit J- <br />Development Standards and Design Guidelines for MountainStar Master Planned Resort December 2, <br />2008; Section 6. <br />18. Drainage plans shall be consistent with the "Master Drainage Plan, MountainStar Master Planned
The URL can be used to link to this page
Your browser does not support the video tag.