Laserfiche WebLink
<br />6. The Final Plat shall meet all requirements of applicable law as defined in the Development <br />Agreement. <br /> <br />7. The Final Plat shall contain the name of the Engineer/Surveyor responsible for preparing the <br />documents on all sheets. <br /> <br />8. The Final Plat shall contain the page number and total number of pages on all sheets. <br /> <br />9. All development, design and construction shall comply with all applicable laws as defined in the <br />Development Agreement. <br /> <br />10. Lot and road dimensions are to be shown on the face of the plat. <br /> <br />11. The applicant shall contact the Kittitas County Rural Addressing Coordinator at (509) 962-7523 to <br />obtain addresses prior to obtaining a building permit. A parcel cannot receive a building permit or <br />utilities until such parcel is identified with a 911 address. <br /> <br />12. Civil Plans will be reviewed and approved as submitted prior to final plat approval in accordance with <br />the Development Agreement. <br /> <br />13. Roadway design shall include plan and profile drawings meeting design parameters detailed in “Table <br />1 – MountainStar Roadway Design Criteria”; Exhibit J – Development Standards and Design <br />Guidelines for MountainStar Master Planned Resort December 2, 2008. Specifically, Loop road <br />requirements. <br /> <br />14. Required Infrastructure and Utilities, as defined in the Development Agreement, shall be installed and <br />completed or bonded or other financial guaranties or accommodations made for their completion prior <br />to final plat approval of each subphase. <br /> <br />15. Timing of Improvements: Per the Suncadia 2009 Development Agreement section 5.3 Infrastructure, <br />Surety Bonding or Other Assurances. Infrastructure identified by Trendwest in an approved Site <br />Development Plan must be provided and available for use before the issuance of the first certificate of <br />occupancy for Master Planned Resort Accommodation Units included with such plan. For purposes <br />of final plat approval or issuance of building permits, infrastructure may be guaranteed through surety <br />bonding or other financial assurance device acceptable to the County. The estimated costs of <br />providing all such guaranteed Infrastructure shall be reviewed and approved by the County Public <br />Works Director or designee. Surety bonding or other financial device provided to the County shall be <br />in an amount equal to at least 110% of such estimated costs as determined by Trendwest’s architects <br />and engineers. <br /> <br />16. Water system design requirements shall be consistent with requirements presented in Exhibit J- <br />Development Standards and Design Guidelines for MountainStar Master Planned Resort December 2, <br />2008; Section 6. An accounting of equivalent residential unit allocation serving Talisman shall be <br />provided with final water system plan submittal. <br /> <br />17. System design requirements shall be consistent with requirements presented in Exhibit J- <br />Development Standards and Design Guidelines for MountainStar Master Planned Resort December 2, <br />2008; Section 6. <br /> <br />18. Drainage plans shall be consistent with the “Master Drainage Plan, MountainStar Master Planned